I have a timeseries data of list of processes uploaded to PowerBI desktop.
The data is composed of multiple processes and sub process and their start and finish time. Each process has multiple sub processes. Each sub process (of a parent process) is scheduled to run everyday. Sub processes run concurrently. For a process to be completed, all sub processes (which belong to that particular process) should be finished.
Start time and finish time for each sub process is recorded.
Below is a sample data for illustration purposes. I need to calculate the elapsed time for each distinct process for each day. To calculate the elapsed time for a process, we need to find sub process started earliest before all other sub processes and we also need to find the sub process finished the latest and then we need to take the time difference between the finish time and start time (in minutes) to calculate the elapsed time for that process.
For example, in Table1, process P1 has 3 sub processes and among all 3 sub processes, the one that starts the earliest is P1_Sub (which has a start time of "1/01/2021 9:00") and the sub process that finishes the latest is P1_Sub3 (which has a finish time of "1/01/2021 9:30"). So the elapsed time for the process P1 on the day 1/01/2021 was 30 minutes (which is the time difference between the earliest start time and the latest finish time for its sub processes)
I need to calculate the elapsed time for each process for each day similar to Table2 below.
Can you please help me with the DAX formula?
Thanks
Andy

Related

Processing tasks in parallel in specific time frame without waiting for them to finish

This is a question about concurrency/parallelism and processes. I am not sure how to express it, so please forgive my ignorance.
It is not related to any specific language, although I'm using Rust lately.
The question is if it is possible to launch processes in concurrent/parallel mode, without waiting for them to finish, and within a specific time frame, even when the total time of the processes takes more than the given time frame.
For example: lets say I have 100 HTTP requests that I want to launch in one second, separated by 10ms each. Each request will take +/- 50ms. I have a computer with 2 cores to make them.
In parallel that would be 100 tasks / 2 cores, 50 tasks each. The problem is that 50 tasks * 50ms each is 2500ms in total, so two seconds and half to run the 100 tasks in parallel.
Would it be possible to launch all these tasks in 1s?

Timer/thread colaescing

I have a small project which needs to track stock price % movement for specified time intervals. E.g. It should be able to track AAPL price % move for the last 30sec, 1min, 3min, 5min, 10min. All stocks share the same time intervals. Program will be written in C++ and will be running on Linux, though it shouldn't matter.
Below is the approach I am thinking of,
1) Get stock market data from multicast feed, for around 4000 symbols
2) Process the feed and store them in a global quotes cache
3) Spawn N number of threads, one for each interval
4) Each thread will maintain its own copy of symbols, on startup initialize each symbol with current price from the global cache, then go to sleep for specified interval
5) On wake up, snap the current price (from the quote cache which would have the latest value from the quotes feed), calculate the difference, push this information to a queue
6) Have a dedicated thread to read the queue and publish the prices to a caching server
7) Front end GUI applications read from the caching server and display the percent moves
This approach should work, but is there a better way to do this? Also one area of optimization could be coalescing the thread price snapping part(after the thread wakes up), where if two or more threads will be snapping at the same time, e.g. the 30sec, 1min and 2min threads will snap together every two minutes, so combine them into one snap. What logic can I use to do the coalescing? Thank you.

how to detect if a thread or process is getting starved due to OS scheduling

This is on Linux OS. App is written in C++ with ACE library.
I am suspecting that one of the thread in the process is getting blocked for unusually long time(5 to 40 seconds) sometimes. The app runs fine most of the times except couple times a day it has this issue. There are other similar 5 apps running on the box which are also I/O bound due to heavy socket incoming data.
I would like to know if there is any thing I can do programatically to see if the thread/process are getting their time slice.
If a process is being starved out, self monitoring for that process would not be that productive. But, if you just want that process to notice it hasn't been run in a while, it can call times periodically and compare the relative difference in elapsed time with the relative difference in scheduled user time (you would sum the tms_utime and tms_cutime fields if you want to count waiting for children as productive time, and you would sum in the tms_stime and tms_cstime fields if you count kernel time spent on your behalf to be productive time). For thread times, the only way I know of is to consult the /proc filesystem.
A high priority external process or high priority thread could externally monitor processes (and threads) of interest by reading the appropriate /proc/<pid>/stat entries for the process (and /proc/<pid>/task/<tid>/stat for the threads). The user times are found in the 14th and 16th fields of the stat file. The system times are found in the 15th and 17th fields. (The field positions are accurate for my Linux 2.6 kernel.)
Between two time points, you determine the amount of elapsed time that has passed (a monitor process or thread would usually wake up at regular intervals). Then the difference between the cumulative processing times at each of those time points represents how much time the thread of interest got to run during that time. The ratio of processing time to elapsed time would represent the time slice.
One last bit of info: On Linux, I use the following to obtain the tid of the current thread for examining the right task in the /proc/<pid>/task/ directory:
tid = syscall(__NR_gettid);
I do this, because I could not find the gettid system call actually exported by any library on my system, even though it was documented. But, it might be available on yours.

Scheduling Task Based on Date time

I am working for private video network where I have to schedule the
task based on following parameter.There is client Portal, Server and Gateway.
Through portal a user can request Streaming the video.
User can also Schedule Streaming for some future time.Each each task is having a task ID.
Task is scheduled based on following date time parameter.
start time
end time
Repeat (every day,just once, a particular day)
start date
end date
Now at the gateway I need to add logic to Implement schedule task.
I am exploring Waitable Timer Objects and CreateWaitableTimerEe.
I am bit confused whether it is possible to implement the feature using this.
I am using C++, MFC and can't use third party library.
I need Suggestion how to implement this.
There are dozens of ways to design this. It all depends on what you want to do and what the specific requirements are.
In a basic design I'd create an additional field called "next run time" which will be calculated by using start time, frequency and previous (if any) end time. Then I'd dump all the tasks in a queue sorted using this field.
The main scheduling will pick up the first queue item and create a suspended thread for that specific task. Now just calculate the time difference to the first item's 'next run time' and sleep for that time period. When you wake up just resume the thread and pick the next queue item and repeat.
I would just create a timer thread callback loop that checks the time every minute and executes your task on the specified schedule.

Modify Time for simulation in c++

i am writing a program which simulates an activity, i am wondering how to speed up time for the simulation, let say 1 hour in the real world is equal to 1 month in the program.
thank you
the program is actually similar to a restaurant simulation where you dont really know when customer come. let say we pick a random number (2-10) customer every one hour
It depends on how it gets time now.
For example, if it calls Linux system time(), just replace that with your own function (like mytime) which returns speedier times. Perhaps mytime calls time and multiplies the returned time by whatever factor makes sense. 1 hr = 1 month is 720 times. Handling the origin as when the program begins should be accounted for:
time_t t0;
main ()
{
t0 = time(NULL); // at program initialization
....
for (;;)
{
time_t sim_time = mytime (NULL);
// yada yada yada
...
}
}
time_t mytime (void *)
{
return 720 * (time (NULL) - t0); // account for time since program started
// and magnify by 720, so one hour is one month
}
You just do it. You decide how many events take place in an hour of simulation time (eg., if an event takes place once a second, then after 3600 simulated events you've simulated an hour of time). There's no need for your simulation to run in real time; you can run it as fast as you can calculate the relevant numbers.
It sounds like you are implementing a Discrete Event Simulation. You don't even need to have a free-running timer (no matter what scaling you may use) in such a situation. It's all driven by the events. You have a priority queue containing events, ordered by the event time. You have a processing loop which takes the event at the head of the queue, and advances the simulation time to the event time. You process the event, which may involve scheduling more events. (For example, the customerArrived event may cause a customerOrdersDinner event to be generated 2 minutes later.) You can easily simulate customers arriving using random().
The other answers I've read thus far are still assuming you need a continuous timer, which is usually not the most efficient way of simulating an event-driven system. You don't need to scale real time to simulation time, or have ticks. Let the events drive time!
If the simulation is data dependent (like a stock market program), just speed up the rate at which the data is pumped. If it is some think that depends on time() calls you will have to do some thing like wallyk's answer (assuming you have the source code).
If time in your simulation is discrete, one option is to structure your program so that something happens "every tick".
Once you do that, time in your program is arbitrarily fast.
Is there really a reason for having a month of simulation time correspond exactly to an hour of time in the real world ? If yes, you can always process the number of ticks that correspond to a month, and then pause the appropriate amount of time to let an hour of "real time" finish.
Of course, a key variable here is the granularity of your simulation, i.e. how many ticks correspond to a second of simulated time.