Stacked bar chart of Actuals vs budget in powerbi - powerbi

Can anyone please help me to get a chart like below in power BI where I get 'Actuals' and 'Plan' in a single stacked bar chart with products as legends

Related

How to adjust axis tick in power bi dashboard

I'm building charts in power bi dashboard. One question is how to adjust x-axis tick. I'm plotting yearly data of 10 years. The tick appears every 5 years. I'd like them to display for each yearly data point. Thanks.

vertical scroll bar in report doesn't show up in tile in Dashboard Power BI

I have been trying to pin the Power BI report in dashboard when publishing to power BI but the vertical scroll bar in report doesn't show up in dashboard. I am able to use the scroll bar in report but when I pin that in dashboard, I can't see the scroll bar in that tile in dashboard.
I would suggest you use pages, as per the Power BI, after publishing to Power BI, only the section visible inside the Gridlines in the Desktop is visible.
For this problem, you can use multiple pages, after publishing, you would be able to switch between pages.
Hope it answers your question, Prashant!

Power BI Pie chart interactive

I am using the pie chart to show single values as a summary:
When I select the pie chart I would like the tables to be filtered out but this isnt happening. Any advise on how I can get these to filter out on tables?

Power Bi timeseries correlation with events

I am actually working on a Power Bi timeseries visual, to show the changes of air-quality during the corona-crisis. To show the correlation, I want to display the corona time-frame. Is there any possibility to make this visual.
Thanks, Andreas

Unable to select Ribbon chart Y-axis data range on Power BI due to Y-axis config option not available

Plotting issue on Ribbon chart due to configuration issue of Y-axis range
Power BI version:
My data is
What we need is
I have selected Line and stacked column chart and configured Y-axis then changed ribbon chart not it showing as below.
1) Configuring Y-axis
2) After configuration changed ribbon chart as result what we want