I am having an issue with tests sporadically failing when using nunit 3 and using parallel test running.
We have a number of tests that currently are structured as follows
[TestFixture]
public class CalculateShipFromStoreShippingCost
{
private IService_service;
private IClient _client;
[SetUp]
public void SetUp()
{
_service = Substitute.For<IService>();
_client = new Client(_service);
}
[Test]
public async Task WhenScenario1()
{
_service.Apply(Args.Any<int>).Returns(1);
var result = _client.DoTheThing();
Assert.IsTrue(1,result);
}
[Test]
public async Task WhenScenario2()
{
_service.Apply(Args.Any<int>).Returns(2);
var result = _client.DoTheThing();
Assert.IsTrue(2,result);
}
}
Sometimes the test fail as one of the substitutes is returning the value for the other test.
How should this test be structured so that with Nunit it will run reliably when done in parallel

You haven't shown any Parallelizable attributes in your example, so I assume you are using the attribute at a higher level, most likely on the assembly. Otherwise, no parallel execution would occur. Further, since you say the test cases are running in parallel, you have apparently specified ParallelScope.Children.
The two test cases shown in your fixture cannot run in parallel. You should bear in mind that the SetUp method runs for each of the tests. So each of your two tests sets the value of _service, which is part of the state of the single instance of CalculateShipFromStoreShippingCost, which is shared by both tests. That is why you are seeing the "wrong" substitute being returned at times.
It is not possible for two test cases to run reliably in parallel if they both change the state of the fixture. Note that it does not matter whether the assignment to _service takes place in the test method itself or in the SetUp method - both are executed as part of the test case. So, you have to either stop running these two cases in parallel or stop changing the state.
To stop running the tests in parallel, you simply add [NonParallelizable] to each test method. If you are not using the latest framework version, use [Parallelizable(ParallelScope.None)] instead. Your other tests will continue to run in parallel, but these two will not.
Alternatively, use ParallelScope.Fixture at the assembly level. This will cause fixtures to run in parallel by default, while the individual test cases within them each run sequentially. When using ParallelizableAttribute at the assembly level, it is sometimes best to take a more conservative approach, adding in more parallelism within some fixtures where it is useful.
An entirely different approach is to make your tests stateless. Eliminate the _service member and use a local value within the test method itself. Each of your tests would add two lines like...
var service = SubstituteFor<IService>();
var client = new Client(service);
As shown in your example, I would imagine you are getting very little performance gain from running the two methods in parallel, so I would not use that last approach unless I saw a specific performance reason to do so.
As a final note... If you use make your fixtures run in parallel by default (either with an assembly-level attribute or with attributes on each fixture) and place no Parallelizable attribute on your test cases, NUnit uses an optimization, whereby all the tests within the fixture run on the same thread. This saving in context changes will often make up for the loss of any performance improvement you hoped to get through running in parallel.

Related

Running TestNG test sequentially with time-gap

I have couple of DAO unit test classes that I want to run together using TestNG, however TestNG tries to run them in parallel which results in some rollbacks failing. While I would like to run my Unit Test classes run sequentially, I also want to be able to specify a minimum time that TestNG must wait before it runs the next test. Is this achievable?
P.S. I understand that TestNG can be told to run all the tests in a test class in a SingleThread, I am able to specify the sequence of method calls anyway using groups, so that's not an issue perhaps.
What about a hard dependency between the 2 tests? If you write that:
#Test
public void test1() { ... }
#Test(dependsOnMethods = "test1", alwaysRun = true)
public void test2() { ... }
then test2 will always be run after test1.
Do not forget alwaysRun = true, otherwise if test1 fails, test2 will be skipped!
If you do not want to run your classes in parallel, you need to specify the parallel attribute of your suite as false. By default, it's false. So I would think that it should run sequentially by default, unless you have some change in the way you invoke your tests.
For adding a bit of delay between your classes, you can probably add your delay logic in a method annotated with #AfterClass. AFAIK testng does not have a way to specify that in a testng xml or commandline. There is a timeout attribute but that is more for timing out tests and is not probably what you are looking for.
For adding delay between your tests i.e. test tags in xml, then you can try implementing the ITestListener - onFinish method, wherein you can add your delay code. It is run after every <test>. If a delay is required after every testcase, then implement delay code in IInvokedMethodListener - AfterInvocation() which is run after every test method runs. You would need to specify the listener when you invoke your suite then.
Hope it helps..
Following is what I used in some tests.
First, define utility methods like this:
// make thread sleep a while, so that reduce effect to subsequence operation if any shared resource,
private void delay(long milliseconds) throws InterruptedException {
Thread.sleep(milliseconds);
}
private void delay() throws InterruptedException {
delay(500);
}
Then, call the method inside testing methods, at end or beginning.
e.g
#Test
public void testCopyViaTransfer() throws IOException, InterruptedException {
copyViaTransfer(new File(sourcePath), new File(targetPath));
delay();
}

Application Service Layer: Unit Tests, Integration Tests, or Both?

I've got a bunch of methods in my application service layer that are doing things like this:
public void Execute(PlaceOrderOnHoldCommand command)
{
var order = _repository.Load(command.OrderId);
order.PlaceOnHold();
_repository.Save(order);
}
And at present, I have a bunch of unit tests like this:
[Test]
public void PlaceOrderOnHold_LoadsOrderFromRepository()
{
var repository = new Mock<IOrderRepository>();
const int orderId = 1;
var order = new Mock<IOrder>();
repository.Setup(r => r.Load(orderId)).Returns(order.Object);
var command = new PlaceOrderOnHoldCommand(orderId);
var service = new OrderService(repository.Object);
service.Execute(command);
repository.Verify(r => r.Load(It.Is<int>(x => x == orderId)), Times.Exactly(1));
}
[Test]
public void PlaceOrderOnHold_CallsPlaceOnHold()
{
/* blah blah */
}
[Test]
public void PlaceOrderOnHold_SavesOrderToRepository()
{
/* blah blah */
}
It seems to be debatable whether these unit tests add value that's worth the effort. I'm quite sure that the application service layer should be integration tested, though.
Should the application service layer be tested to this level of granularity, or are integration tests sufficient?
I'd write a unit test despite there also being an integration test. However, I'd likely make the test much simpler by eliminating the mocking framework, writing my own simple mock, and then combining all those tests to check that the the order in the mock repository was on hold.
[Test]
public void PlaceOrderOnHold_LoadsOrderFromRepository()
{
const int orderId = 1;
var repository = new MyMockRepository();
repository.save(new MyMockOrder(orderId));
var command = new PlaceOrderOnHoldCommand(orderId);
var service = new OrderService(repository);
service.Execute(command);
Assert.IsTrue(repository.getOrder(orderId).isOnHold());
}
There's really no need to check to be sure that load and/or save is called. Instead I'd just make sure that the only way that MyMockRepository will return the updated order is if load and save are called.
This kind of simplification is one of the reasons that I usually don't use mocking frameworks. It seems to me that you have much better control over your tests, and a much easier time writing them, if you write your own mocks.
Exactly: it's debatable! It's really good that you are weighing the expense/effort of writing and maintaining your test against the value it will bring you - and that's exactly the consideration you should make for every test you write. Often I see tests written for the sake of testing and thereby only adding ballast to the code base.
As a guideline I usually take that I want a full integration test of every important successful scenario/use case. Other tests I'll write are for parts of the code that are likely to break with future changes, or have broken in the past. And that is definitely not all code. That's where your judgement and insight in the system and requirements comes into play.
Assuming that you have an (integration) test for service.Execute(placeOrderOnHoldCommand), I'm not really sure if it adds value to test if the service loads an order from the repository exactly once. But it could be! For instance when your service previously had a nasty bug that would hit the repository ten times for a single order, causing performance issues (just making it up). In that case, I'd rename the test to PlaceOrderOnHold_LoadsOrderFromRepositoryExactlyOnce().
So for each and every test you have to decide for yourself ... hope that helps.
Notes:
The tests you show can be perfectly valid and look well written.
Your test sequence methods seems to be inspired on the way the Execute(...) method is currently implemented. When you structure your test this way, it could be that you are tying yourself to a specific implementation. This way, tests can actually make it harder to change - make sure you're only testing the important external behavior of your class.
I usually write a single integration test of the primary scenario. By primary scenario i mean the successful path of all the code being tested. Then I write unit tests of all the other scenarios like checking all the cases in a switch, testing exception and so forth.
I think it is important to have both and yes it is possible to test it all with integration tests only, but that makes your tests long running and harder to debug. In average I think I have 10 unit tests per integration test.
I don't bother to test methods with one-liners unless something bussines logic-like happens in that line.
Update: Just to make it clear, cause I'm doing test-driven development I always write the unit tests first and typically do the integration test at the end.

spring, transaction and unit tests - how to set transaction on class level

I'm using Spring junit runner, and its transaction capabilities to start and rollback transactions before and after every test.
However I have a test class with some heavy DB initialization and I want each test (method) to run within the transaction scope, i.e. start a transaction at the beginning of the test and roll it back after all tests in the class completed.
Are You aware that having all the test methods inside your class within a single transaction will cause a lot of trouble? Basically you can no longer depend on having a clean database as other test methods will modify it along the way. And because the order of test methods is not specified, you cannot depend on it as well (so you'll never know what exactly does the database hold). Essentially You are giving up all test transactional support, your only guarantee is that after running the whole test case, the database will remain clean (so other test cases won't be affected).
End of grumbling thou. I don't think Spring supports such a behavior out-of-the-box (partially due to the reasons highlighted above). However, if You look closely at TransactionalTestExecutionListener, it is responsible for transactional support in Spring-powered tests.
#Override
public void beforeTestMethod(TestContext testContext) throws Exception {
//...
startNewTransaction(testContext, txContext);
}
and:
#Override
public void afterTestMethod(TestContext testContext) throws Exception {
//...
endTransaction(testContext, txContext);
//...
}
Now look even closer, there are unimplemented beforeTestClass and afterTestClass... You will find detailed instructions how to wire this all up in chapter 9.3.5 of Spring reference documentation. Hint: write your own listener and use it instead of TransactionalTestExecutionListener.

Run TestMethod with different datasets NOT from a database

So a TestMethod runs only once in one test run.
How can I, in a single test run, let a TestMethod run several times, each time for a different data set that I've set up? My data does not come from a database or file; I want to build up several different in-memory instances of test data mockup.
TestInitialize doesn't let me do this as it runs only once, as well.
What's in control of the execution of TestMethods? How to make it re-run my TestMethods for each data set and how do I access the data set then?
I thought TestContext would be useful but it seems to be database only?
What you're looking for is so-called Data-driven testing.
Look e.g. here and here for descriptions on how to do it with MSTest.
HTH.
Thomas
You could define a test method which calls the other test method multiple times, after doing the correct setup, I'm not saying that this is a good thing to do, but I believe it would work
public class TestClass
{
//This is where the per-data-source test is. This is not marked as a TestMehod because
//it will not be invoked directly by the test runner.
public void ActualTest()
{
//Per-data-source test logic here.
}
[TestMethod]
public void RunActualTestsMultipleTimesWithDifferentConfigs()
{
//Setup for test run with data set 1
ActualTest();
//Setup for test with data set 2
ActualTest();
}
}
This feels like a terrible, terrible hack, I freely admit that. I wouldn't use this myself if I had any other choice, but it may be an option.
Another possibility is to look into how extensible MSTest is, specifically whether or not there is any mechinism to modify or extend the test runner

How do I ignore a test based on another test in NUnit?

I'm writing some NUnit tests for database operations. Obviously, if Add() fails, then Get() will fail as well. However, it looks deceiving when both Add() and Get() fail because it looks like there's two problems instead of just one.
Is there a way to specify an 'order' for tests to run in, in that if the first test fails, the following tests are ignored?
In the same line, is there a way to order the unit test classes themselves? For example, I would like to run my tests for basic database operations first before the tests for round-tripping data from the UI.
Note: This is a little different than having tests depend on each other, it's more like ensuring that something works first before running a bunch of tests. It's a waste of time to, for example, run a bunch of database operations if you can't get a connection to the database in the first place.
Edit: It seems that some people are missing the point. I'm not doing this:
[Test]
public void AddTest()
{
db.Add(someData);
}
[Test]
public void GetTest()
{
db.Get(someData);
Assert.That(data was retrieved successfully);
}
Rather, I'm doing this:
[Test]
public void AddTest()
{
db.Add(someData);
}
[Test]
public void GetTest()
{
// need some way here to ensure that db.Add() can actually be performed successfully
db.Add(someData);
db.Get(somedata);
Assert.That(data was retrieved successfully);
}
In other words, I want to ensure that the data can be added in the first place before I can test whether it can be retrieved. People are assuming I'm using data from the first test to pass the second test when this is not the case. I'm trying to ensure that one operation is possible before attempting another that depends on it.
As I said already, you need to ensure you can get a connection to the database before running database operations. Or that you can open a file before performing file operations. Or connect to a server before testing API calls. Or...you get the point.
NUnit supports an "Assume.That" syntax for validating setup. This is documented as part of the Theory (thanks clairestreb). In the NUnit.Framework namespace is a class Assume. To quote the documentation:
/// Provides static methods to express the assumptions
/// that must be met for a test to give a meaningful
/// result. If an assumption is not met, the test
/// should produce an inconclusive result.
So in context:
public void TestGet() {
MyList sut = new MyList()
Object expecting = new Object();
sut.Put(expecting);
Assume.That(sut.size(), Is(1));
Assert.That(sut.Get(), Is(expecting));
}
Tests should never depend on each other. You just found out why. Tests that depend on each other are fragile by definition. If you need the data in the DB for the test for Get(), put it there in the setup step.
I think the problem is that you're using NUnit to run something other than the sort of Unit Tests that NUnit was made to run.
Essentially, you want AddTest to run before GetTest, and you want NUnit to stop executing tests if AddTest fails.
The problem is that that's antithetical to unit testing - tests are supposed to be completely independent and run in any order.
The standard concept of Unit Testing is that if you have a test around the 'Add' functionality, then you can use the 'Add' functionality in the 'Get' test and not worry about if 'Add' works within the 'Get' test. You know 'Add' works - you have a test for it.
The 'FIRST' principle (http://agileinaflash.blogspot.com/2009/02/first.html) describes how Unit tests should behave. The test you want to write violates both 'I' (Isolated) and 'R' (Repeatable).
If you're concerned about the database connection dropping between your two tests, I would recommend that rather than connect to a real database during the test, your code should use some sort of a data interface, and for the test, you should be using a mock interface. If the point of the test is to exercise the database connection, then you may simply be using the wrong tool for the job - that's not really a Unit test.
I don't think that's possible out-of-box.
Anyway, your test class design as you described will make the test code very fragile.
MbUnit seems to have a DependsOnAttribute that would allow you to do what you want.
If the other test fixture or test
method fails then this test will not
run. Moreover, the dependency forces
this test to run after those it
depends upon.
Don't know anything about NUnit though.
You can't assume any order of test fixture execution, so any prerequisites have to be checked for within your test classes.
Segregate your Add test into one test-class e.g. AddTests, and put the Get test(s) into another test-class, e.g. class GetTests.
In the [TestFixtureSetUp] method of the GetTests class, check that you have working database access (e.g. that Add's work), and if not, Assert.Ignore or Inconclusive, as you deem appropriate.
This will abort the GetTests test fixture when its prerequisites aren't met, and skip trying to run any of the unit tests it contains.
(I think! I'm an nUnit newbie.)
Create a global variable and return in the test for Get unless Add set it to true (do this in the last line of Add):
public boolean addFailed = false;
public void testAdd () {
try {
... old test code ...
} catch (Throwable t) { // Catch all errors
addFailed = true;
throw t; // Don't forget to rethrow
}
}
public void testGet () {
if (addFailed) return;
... old test code ...
}