I am trying to set up a chart with two or later on multiple lines in one chart.
The data is collected from a logging database and has different starting points.
The example:
I tracked the result of a search for item 123 with search term ABC starting from June 1st each day.
On June 3rd I added another tracked search for item 123 with search term XYZ.
Now I want to display a line chart starting from June 1st with both tracked searches, each as an own line. One line starting on June 1st, the other starting on June 3rd.
Is that possible?
Try making a scatter graph instead, with a list of x/y coordinates for each point. Either that, or put in dummy data point for your missing data.
Related
I have report where I wanna show 11 Bins where allegations are counted to the different bins. As well I wanna show a limit line.
Like here:
But when I show how often an allegation is in a bin (using column legend) then my limit line is only shown when there are allegations in a bin.
Like here:
I have no idea how I can show the whole limit line from bin 1 - 11.
Maybe there is another to show such limit line.
Btw. How can I define that each bin is numbered on x-axis?
Thanks in advance
Sometimes you can see the forest for the trees.
After I switched from clustered columns/lines to clustered columns everything went as desired.
I have a chart in excel I wish to replicate in PBI.
My Excel chart is a bar chart dated axis with 2 series, running up march, but with data only up until now.
Each bar series has a trendline, which forecasts a trend up to the end of the financial year.
In power BI I have tried to replicate, but I cannot seem to add 'forecast' from the analytics tab unless my chart is a line graph.
So I now have 2 line series in a chart like so:
I have added trendline to both but there is no option to add the forecast line unless I only have 1 data series.
As I've removed a series I can now toggle on the forecast line in the analytics tab.
So I now have 1 line series in my line graph like so:
I actually need to have the data and the corresponding forecast for both data series, so I would have series 1 & 2 plotted like above, on the same graph together.
Is there a way to do this on the analytics tab??
If not, how should I go about it? I was thinking I could use DAX to forecast until March 2023 instead and then drag the line into the line graph and format it to dashed?
Thanks
Here is some sample data step by step for what i'm looking for (very simple thing to do in excel!):
This is the same data, pivoted with the 2 series mapped out on a line graph, and trendline added for each:
I just want to be able to show a trendline extending and forecasting forward, past the months I already have like I have done in Excel.
Yeah i think here your best solution would be to use the "what if" parameter in Dax to get the result you need
For a forecasting line to be performed on a line chart, Below requirements should be met. Otherwise You can't see this option on the analytics tab:
You need to change your datasets, and datatypes accordingly.
The last one is especially valid for you, because there is not a one-day period between your data values, in fact monthly organized.
I'm creating a line chart in PowerBi for NPS where the line legend is the year and the x-axi label is the first initial of the month. I'm having a dilemma in sorting the month initial. Can someone assist on this? thanks in advance.
There are two ways to sort.
The first one is on graph level, meaning that you will only sort one specific graph:
Steps:
Click on the graph you want to sort
Click on the three dots
Click 'sort'(In my example named 'Sorteren op')
Choose what you want to sort on.
However, this will most likely not provide you with the right solution. Since it is already sorted on date letter, but in alphabetical order.
Therefore the second solution, sort on colum.
First, we go to the data tab (Or columns tab).
In my example, I have opened a date table to match your question.
Here I select the 'MonthShort' (MaandKort) because I want it sorted based on a number instead of on letters.
Sort on column:
Sort on column select:
If you click the column, it automatically opens the 'kolomhulpmiddelen' tab. Here you can select the 'sort on column' pane and click on the column you want to sort on.
In my case, I chose the monthnumber. So from now on, if I use the MonthShort in a graph, it will sort it based on the monthnumber, meaning that I will see Jan - Feb - Mar etc.
Note: This is from the Dutch version of Power BI.
I have built a line chart using two filter conditions and want to include dynamic average line to the visual. Like for example I need to show the average line based on two parameters, first is date i.e. 21st Jan - 25 Jan and the site locations selected, it will only consider average between 21st to 25th Jan and not till 4th of Feb.
The site location will also be selected to count the call volume.
I am struggling to find a way around as I I thought of using SelectedValue or switch method.
Any help will be much appreciated.
I've created a budget sheet that includes a running balance in column E.
The problem that I've run into is my formula =IF(C140="","",(SUM($E139,C140))) works down the line after E140 (first day of the month that I started to implement this) until there is a blank. At the blank, the formula breaks for me. Now because this is a projected running total, it's preferred to have the blank spaces to allow for the days of the month.
I've tried a couple different ways to get the isblank or lookup formulas to work but I realize this is beyond my excel and google sheets knowledge. Is there a way to get the formula to skip the blank cells down column E and just use the last value, ie $598.66 in E143 when you get to the next cell that has a value in it, ie E151?
Photo added for reference....
try:
=ARRAYFORMULA(IF(E2:E="",,MMULT(TRANSPOSE((ROW(E2:E)<=
TRANSPOSE(ROW(E2:E)))*E2:E), SIGN(E2:E)^0)))