Integration vs Unit Testing - unit-testing

Im developing with Grails. Since the framework will bootstrap data and a fully flushed out spring context, I find that I write a lot of integration tests for services. Let me rephrase that: I find I write no unit tests for services, only integration tests. Is this a bad idea? The only downside I see to it is that my tests take a bit longer to run.
I do use unit testing on controllers, as in a controller I am testing the various application flows, result types, redirect logic, etc. But the majority of tests I write are integration tests. This seems a break from tradition J2EE tests, where mostly unit tests are written.
edit- to be clear, Im not writing integration tests because the code is so complicated only integration tests will do. Im writing integration tests because it is easier to test everything together, since the framework gives you so much. I do mock certain things, like if a service collaborates with the acegi authenticationService, I mock that. I also mock anytime we interact with a webservice, because you have to in order to get a test that runs without special setup.

I clearly see a trend towards more functional tests and fewer unit tests, in particular for heavily-connected components low on logic. If I implement a complicated algorithm in a particular class, I will usually write unit tests for it, but if the complexity is due to integration with other components (which is very frequently the case), unit tests are not worth the hassle.

In general, the important measure is the code coverage.
In can be advantageous to do integration tests if the global interface is more stable (less subject to change).

You may be able to use a mock framework to isolate different parts of your services for individual testing. Instead of relying on the massive Spring context, directly instantiate your service class and fill in the dependencies not directly relevant to the test with mocks. You may need a little refactoring to decouple your dependencies, but it will usually be for the best. This can lead to writing more and smaller tests instead of relying on a few large integration tests.
I am in a similar situation where many established tests are really integration tests, and it can be difficult, but not impossible, to change this going forward.

You should test as soon as possible, because you want errors to show up as soon as possible, ideally while our code is still under your own control. The later an error is discovered the higher the costs of the correction will be.
If you are exposing non trivial logic, you should test the logic of the main decision paths with unit tests, and the exposure of that logic and the interaction with external dependencies in the integration tests.
If you are a lone developer or working in a small team, sometimes it's difficult to see the distinction between unit and integration tests. If you are in an environment where multiple teams are working on a single product, the assumption is that the logic inside your code has already been verified (unit test) and now you want to see how the modules play with each other (integration test).
It is not a good pattern to load too much into the integration test, because you are deferring testing to a later phase in your project or development environment, and sooner or later you are going to find that you are discovering errors once the code has left your desk. That will mean holding up the entire and possibly the product release while you fix something you could and should have discovered earlier.

Related

Unit tests as Cucumber acceptance tests

We've got our application unit tested and there are two system tests using Robot verifying the basic functionality. There is also a bunch of requirements (acceptance tests) from business as .feature files in Gherkin that we run using Cucumber.
We started implementing them as integration tests using rest assured - everything was fine for the basic functionality. The problem is with implementing the more detailed scenarios - some things that we need to verify are not persisted in DB or returned by the endpoint.
It would be really easy to test that functionality by implementing those scenarios as unit tests but I'm not sure if that is a good practice?
I think there needs to be a back-and-forth between yourselves and the business. You'll usually end up with a couple of integration tests to prove the feature works end-to-end in a happy path/negative scenario, but you won't go through all the edge cases since that is costly (time-consuming, especially when running the integration tests). That's what the unit tests are for, covering every scenario. Convey that to the business and they might learn to trust your judgement instead of implementing each and every one of the acceptance criteria as an integration test.
It would be really easy to test that functionality by implementing those scenarios as unit tests but I'm not sure if that is a good practice?
If they're not implemented, it's definitely a good practice to do so as soon as possible, but, I'd pay attention to the test's scope. I also see no problem in using Cucumber to aid your unit testing effort, but don't fall into the mistake of making your unit tests bigger scope acceptance tests. Keep them as direct as possible.
You mention the complexity of some of these scenarios:
some things that we need to verify are not persisted in DB or returned by the endpoint
Then the code should probably be more testable/maintainable on different levels. You can achieve this with some techniques. Depending on the language you use, you could use a tool similar to mockito spy to spy object's interactions that otherwise, you have no way of checking, but, it's only wise to do so on appropriate test scope, like with Unit and Mock tests.
Also, consider that it's perfectly fine if you cover different parts of a given flow with different test levels. Ideally, you'll cover most of it with unit tests.
You can keep the most complex unit parts covered with unit tests, and still maintain the higher level acceptance scenarios business asks you to but don't do deep assertions in the tests.
I interpret your question as "Is it ok to use unit tests at the same time as you use BDD?"
My take is that these are two techniques that complement each other. If something is easier using one technique, then use that technique in that particular case.
Use whatever that supports your delivery of working software. Working software is the goal, not using a specific tool.

Why using Integration tests instead of unit tests is a bad idea?

Let me start from definition:
Unit Test is a software verification and validation method in which a programmer tests if individual units of source code are fit for use
Integration testing is the activity of software testing in which individual software modules are combined and tested as a group.
Although they serve different purposes very often these terms are mixed up. Developers refer to automated integration tests as unit tests. Also some argue which one is better which seems to me as a wrong question at all.
I would like to ask development community to share their opinions on why automated integration tests cannot replace classic unit tests.
Here are my own observations:
Integration tests can not be used with TDD approach
Integration tests are slow and can not be executed very often
In most cases integration tests do not indicate the source of the problem
it's more difficult to create test environment with integration tests
it's more difficult to ensure high coverage (e.g. simulating special cases, unexpected failures etc)
Integration tests can not be used with Interaction based testing
Integration tests move moment of discovering defect further (from paxdiablo)
EDIT: Just to clarify once again: the question is not about whether to use integration or unit testing and not about which one is more useful. Basically I want to collect arguments to the development teams which write ONLY integration tests and consider them as unit tests.
Any test which involve components from different layers is considered as integration test. This is to compare to unit test where isolation is the main goal.
Thank you,
Andrey
Integration tests tell you whether it's working. Unit tests tell you what isn't working. So long as everything is working, you "don't need" the unit tests - but once something is wrong, it's very nice to have the unit test point you directly to the problem. As you say, they serve different purposes; it's good to have both.
To directly address your subject: integration tests aren't a problem, aren't the problem. Using them instead of unit tests is.
There have been studies(a) that show that the cost of fixing a bug becomes higher as you move away from the point where the bug was introduced.
For example, it will generally cost you relatively little to fix a bug in software you haven't even pushed up to source control yet. It's your time and not much of it, I'd warrant (assuming you're any good at your job).
Contrast that with how much it costs to fix when the customer (or all your customers) find that problem. Many level of people get involved and new software has to be built in a hurry and pushed out to the field.
That's the extreme comparison. But even the difference between unit and integration tests can be apparent. Code that fails unit testing mostly affects only the single developer (unless other developers/testers/etc are waiting on it, of course). However, once your code becomes involved in integration testing, a defect can begin holding up other people on your team.
We wouldn't dream of replacing our unit tests with integration tests since:
Our unit tests are automated as well so, other than initial set-up, the cost of running them is small.
They form the beginning of the integration tests. All unit tests are rerun in the integration phase to check that the integration itself hasn't broken anything, and then there are the extra tests that have been added by the integration team.
(a) See, for example, http://slideshare.net/Vamsipothuri/defect-prevention, slide # 5, or search the net for Defect prevention : Reducing costs and enhancing quality. Th graph from the chart is duplicated below in case it ever becomes hard to find on the net:
I find integration tests markedly superior to unit tests. If I unit test my code, I'm only testing what it does versus my understanding of what it should do. That only catches implementation errors. But often a much bigger problem is errors of understanding. Integration tests catch both.
In addition, there is a dramatic cost difference; if you're making intensive use of unit tests, it's not uncommon for them to outweigh all the rest of your code put together. And they need to be maintained, just like the rest of the code does. Integration tests are vastly cheaper -- and in most cases, you already need them anyway.
There are rare cases where it might be necessary to use unit tests, e.g. for internal error handling paths that can't be triggered if the rest of the system is working correctly, but most of the time, integration tests alone give better results for far lower cost.
Integration tests are slow.
Integration tests may break different
reasons (it is not focused and
isolated). Therefore you need more
debugging on failures.
Combination of
scenarios are to big for integration
test when it is not unit tested.
Mostly I do unit tests and 10 times less integration tests (configuration, queries).
In many cases you need both. Your observations are right on track as far as I'm concerned with respect to using integration tests as unit tests, but they don't mean that integration tests are not valuable or needed, just that they serve a different purpose. One could equally argue that unit tests can't replace integration tests, precisely because they remove the dependencies between objects and they don't exercise the real environment. Both are correct.
It's all about reducing the iteration time.
With unit tests, you can write a line of code and verify it in a minute or so. With integration tests, it usually takes significantly longer (and the cost increases as the project grows).
Both are clearly useful, as both will detect issues that the other fails to detect.
OTOH, from a "pure" TDD approach, unit tests aren't tests, they're specifications of functionality. Integration tests, OTOH, really do "test" in the more traditional sense of the word.
Integration testing generally happens after unit testing. I'm not sure what value there is in testing interactions between units that have not themselves been tested.
There's no sense in testing how the gears of a machine turn together if the gears might be broken.
The two types of tests are different. Unit tests, in my opinion are not a alternative to integration tests. Mainly because integration tests are usually context specific. You may well have a scenario where a unit test fails and your integration doesn't and vice versa. If you implement incorrect business logic in a class that utilizes many other components, you would want your integration tests to highlight these, your unit tests are oblivious to this.I understand that integration testing is quick and easy. I would argue you rely on your unit tests each time you make a change to your code-base and having a list of greens would give you more confidence that you have not broken any expected behavior at the individual class level. Unit tests give you a test against a single class is doing what it was designed to do. Integration tests test that a number of classes working together do what you expect them to do for that particular collaboration instance. That is the whole idea of OO development: individual classes that encapsulate particular logic, which allows for reuse.
I think coverage is the main issue.
A unit test of a specific small component such as a method or at most a class is supposed to test that component in every legal scenario (of course, one abstracts equivalence classes but every major one should be covered). As a result, a change that breaks the established specification should be caught at this point.
In most cases, an integration uses only a subset of the possible scenarios for each subunit, so it is possible for malfunctioning units to still produce a program that initially integrates well.
It is typically difficult to achieve maximal coverage on the integration testing for all the reasons you specified below. Without unit tests, it is more likely that a change to a unit that essentially operates it in a new scenario would not be caught and might be missed in the integration testing. Even if it is not missed, pinpointing the problem may be extremely difficult.
I am not sure that most developers refer to unit tests as integration tests. My impression is that most developers understand the differences, which does not mean they practice either.
A unit test is written to test a method on a class. If that class depends on any kind of external resource or behavior, you should mock them, to ensure you test just your single class. There should be no external resources in a unit test.
An integration test is a higher level of granularity, and as you stated, you should test multiple components to check if they work together as expected. You need both integration tests and unit tests for most projects. But it is important they are kept separate and the difference is understood.
Unit tests, in my opinion, are more difficult for people to grasp. It requires a good knowledge of OO principles (fundamentally based on one class one responsibility). If you are able to test all your classes in isolation, chances are you have a well design solution which is maintainable, flexible and extendable.
When you check-in, your build server should only run unit tests and
they should be done in a few seconds, not minutes or hours.
Integration tests should be ran overnight or manually as needed.
Unit tests focus on testing an individual component and do not rely on external dependencies. They are commonly used with mocks or stubs.
Integration tests involve multiple components and may rely on external dependencies.
I think both are valuable and neither one can replace the other in the job they do. I do see a lot of integration tests masquerading as unit tests though having dependencies and taking a long time to run. They should function separately and as part of a continuous integration system.
Integration tests do often find things that unit tests do not though...
Integration tests let you check that whole use cases of your application work.
Unit tests check that low-level logic in your application is correct.
Integration tests are more useful for managers to feel safer about the state of the project (but useful for developers too!).
Unit tests are more useful for developers writing and changing application logic.
And of course, use them both to achieve best results.
It is a bad idea to "use integration tests instead of unit tests" because it means you aren't appreciating that they are testing different things, and of course passing and failing tests will give you different information. They make up sort of a ying and yang of testing as they approach it from either side.
Integration tests take an approach that simulates how a user would interact with the application. These will cut down on the need for as much manual testing, and passing tests will can tell you that you app is good to go on multiple platforms. A failing test will tell you that something is broken but often doesn't give you a whole lot of information about what's wrong with the underlying code.
Unit tests should be focusing on making sure the inputs and outputs of your function are what you expect them to be in all cases. Passing units tests can mean that your functions are working according to spec (assuming you have tests for all situations). However, all your functions working properly in isolation doesn't necessarily mean that everything will work perfectly when it's deployed. A failing unit test will give you detailed, specific information about why it's failing which should in theory make it easier to debug.
In the end I believe a combination of both unit and integration tests will yield the quickest a most bug-free software. You could choose to use one and not the other, but I avoid using the phrase "instead of".
How I see integration testing & unit testing:
Unit Testing: Test small things in isolation with low level details including but not limited to 'method conditions', checks, loops, defaulting, calculations etc.
Integration testing: Test wider scope which involves number of components, which can impact the behaviour of other things when married together. Integration tests should cover end to end integration & behaviours. The purpose of integration tests should be to prove systems/components work fine when integrated together.
(I think) What is referred here by OP as integration tests are leaning more to scenario level tests.
But where do we draw the line between unit -> integration -> scenario?
What I often see is developers writing a feature and then when unit testing it mocking away every other piece of code this feature uses/consumes and only test their own feature-code because they think someone else tested that so it should be fine. This helps code coverage but can harm the application in general.
In theory the small isolation of Unit Test should cover a lot since everything is tested in its own scope. But such tests are flawed and do not see the complete picture.
A good Unit test should try to mock as least as possible. Mocking API and persistency would be something for example. Even if the application itself does not use IOC (Inversion Of Control) it should be easy to spin up some objects for a test without mocking if every developer working on the project does it as well it gets even easier. Then the test are useful. These kind of tests have an integration character to them aren't as easy to write but help you find design flaws of your code. If it is not easy to test then adapt your code to make it easy to test. (TDD)
Pros
Fast issue identification
Helps even before a PR merge
Simple to implement and maintain
Providing a lot of data for code quality checking (e.g. coverage etc.)
Allows TDD (Test Driven Development)
Cons
Misses scenario integration errors
Succumbs to developer blindness in their own code(happens to all of us)
A good integration test would be executed for complete end to end scenarios and even check persistency and APIs which the unit test could not cover so you might know where to look first when those fail.
Pros:
Test close to real world e2e scenario
Finds Issues that developers did not think about
Very helpful in microservices architectures
Cons:
Most of the time slow
Need often a rather complex setup
Environment (persistency and api) pollution issues (needs cleanup steps)
Mostly not feasible to be used on PR's (Pull Requests)
TLDR: You need both you cant replace one with the other! The question is how to design such tests to get the best from both. And not just have them to show good statistics to the management.

How do I write useful unit tests for a mostly service-oriented app?

I've used unit tests successfully for a while, but I'm beginning to think they're only useful for classes/methods that actually perform a fair amount of logic - parsers, doing math, complex business logic - all good candidates for testing, no question. I'm really struggling to figure out how to use testing for another class of objects: those which operate mostly via delegation.
Case in point: my current project coordinates a lot of databases and services. Most classes are just collections of service methods, and most methods perform some basic conditional logic, maybe a for-each loop, and then invoke other services.
With objects like this, mocks are really the only viable strategy for testing, so I've dutifully designed mocks for several of them. And I really, really don't like it, for the following reasons:
Using mocks to specify expectations for behavior makes things break whenever I change the class implementation, even if it's not the sort of change that ought to make a difference to a unit test. To my mind, unit tests ought to test functionality, not specify "the methods needs to do A, then B, then C, and nothing else, in that order." I like tests because I am free to change things with the confidence that I'll know if something breaks - but mocks just make it a pain in the ass to change anything.
Writing the mocks is often more work than writing the classes themselves, if the intended behavior is simple.
Because I'm using a completely different implementation of all the services and component objects in my test, in the end, all my tests really verify is the most basic skeleton of the behavior: that "if" and "for" statements still work. Boring. I'm not worried about those.
The core of my application is really how all the pieces work together, so I'm considering
ditching unit tests altogether (except for places where they're clearly appropriate) and moving to external integration tests instead - harder to set up, coverage of less possible cases, but actually exercise the system as it is mean to be run.
I'm not seeing any cases where using mocks is actually useful.
Thoughts?
If you can write integration tests that are fast and reliable, then I would say go for it.
Use mocks and/or stubs only where necessary to keep your tests that way.
Notice, though, that using mocks is not necessarily as painful as you described:
Mocking APIs let you use loose/non-strict mocks, which will allow all invocations from the unit under test to its collaborators. Therefore, you don't need to record all invocations, but only those which need to produce some required result for the test, such as a specific return value from a method call.
With a good mocking API, you will have to write little test code to specify mocking. In some cases you may get away with a single field declaration, or a single annotation applied to the test class.
You can use partial mocking so that only the necessary methods of a service/component class are actually mocked for a given test. And this can be done without specifying said methods in strings.
To my mind, unit tests ought to test
functionality, not specify "the
methods needs to do A, then B, then C,
and nothing else, in that order."
I agree. Behavior testing with mocks can lead to brittle tests, as you've found. State-based testing with stubs reduces that issue. Fowler weighs in on this in Mocks Aren't Stubs.
Writing the mocks is often more work
than writing the classes themselves
For mocks or stubs, consider using an isolation (mocking) framework.
in the end, all my tests really verify
is the most basic skeleton of the
behavior: that "if" and "for"
statements still work
Branches and loops are logic; I would recommend testing them. There's no need to test getters and setters, one-line pure delegation methods, and so forth, in my opinion.
Integration tests can be extremely valuable for a composite system such as yours. I would recommend them in addition to unit tests, rather than instead of them.
You'll definitely want to test the classes underlying your low-level or composing services; that's where you'll see the biggest bang for the buck.
EDIT: Fowler doesn't use the "classical" term the way I think of it (which likely means I'm wrong). When I talk about state-based testing, I mean injecting stubs into the class under test for any dependencies, acting on the class under test, then asserting against the class under test. In the pure case I would not verify anything on the stubs.
Writing Integration Tests is a viable option here, but should not replace Unit Tests. But since you stated your writing mocks yourself, I suggest using an Isolation Framework (aka Mocking Framework), which I am pretty sure of will be available for your environment too.
Being that you've posted several questions in one I'll answer them one by one.
How do I write useful unit tests for a mostly service-oriented app?
Do not rely on unit tests for a "mostly service-oriented app"! Yes I said that in a sentence. These types of apps are meant to do one thing: integrate services. It's therefore more pressing that you write integration tests instead of unit tests to very that the integration is working correctly.
I'm not seeing any cases where using mocks is actually useful.
Mocks can be extremely useful, but I wouldn't use them on controllers. Controllers should be covered by integration tests. Services can be covered by unit tests but it may be wise to have them as separate modules if the amount of testing slows down your project.
Thoughts?
For me, I tend to think about a few things:
What is my application doing?
How expensive would it be to perform system level / integration tests?
Can I split my application up into modules that can be tested separately?
In the scenario you've provided, I'd say your application is an integration of many services. Therefore, I'd lean heavily on integration tests over unit tests. I'd bet most of the Mocks you've written have been for http related classes etc.
I'm a bigger fan of integration / system level tests wherever possible for the following reasons:
In this day and age of "moving fast", re-factoring the designs of yesterday happens at an ever increasing rate. Integration tests aren't concerned about implementation details at all so this facilitates rapid change. Dynamic languages are in full swing making mocks even more dangerous / brittle. With a static lang, mocks are much safer because your tests won't compile if they're trying to stub out a non existent or misspelled method name.
The amount of code written in an integration test is usually 60% less than the amount of code written in a unit test to achieve the same level of coverage so development time is less. "Yes but it takes longer to run integration tests..." that's where you need to be pragmatic until it actually slows you down to run integration tests.
Integration tests catch more bugs. Mocking is often contrived and removes the developer from the realities of what their changes will do to the application as a whole. I've allowed way more bugs into production under the "safety net" of 100% unit test coverage than I would have with integration tests.
If integration testing is slow for my application then I haven't split it up into separate modules. This is often an indicator early on that I need to do some extracting into separation.
Integration tests do way more for you than reach code coverage, they're also an indicator of performance issues or network problems etc.

What are the pros and cons of automated Unit Tests vs automated Integration tests?

Recently we have been adding automated tests to our existing java applications.
What we have
The majority of these tests are integration tests, which may cover a stack of calls like:-
HTTP post into a servlet
The servlet validates the request and calls the business layer
The business layer does a bunch of stuff via hibernate etc and updates some database tables
The servlet generates some XML, runs this through XSLT to produce response HTML.
We then verify that the servlet responded with the correct XML and that the correct rows exist in the database (our development Oracle instance). These rows are then deleted.
We also have a few smaller unit tests which check single method calls.
These tests are all run as part of our nightly (or adhoc) builds.
The Question
This seems good because we are checking the boundaries of our system: servlet request/response on one end and database on the other. If these work, then we are free to refactor or mess with anything inbetween and have some confidence that the servlet under test continues to work.
What problems are we likely to run into with this approach?
I can't see how adding a bunch more unit tests on individual classes would help. Wouldn't that make it harder to refactor as it's much more likely we will need to throw away and re-write tests?
Unit tests localize failures more tightly. Integration-level tests more closely correspond to user requirements and so are better predictor of delivery success. Neither of them is much good unless built and maintained, but both of them are very valuable if properly used.
(more...)
The thing with units tests is that no integration level test can exercise all the code as much as a good set of unit tests can. Yes, that can mean that you have to refactor the tests somewhat, but in general your tests shouldn't depend on the internals so much. So, lets say for example that you have a single function to get a power of two. You describe it (as a formal methods guy, I'd claim you specify it)
long pow2(int p); // returns 2^p for 0 <= p <= 30
Your test and your spec look essentially the same (this is sort of pseudo-xUnit for illustration):
assertEqual(1073741824,pow2(30);
assertEqual(1, pow2(0));
assertException(domainError, pow2(-1));
assertException(domainError, pow2(31));
Now your implementation can be a for loop with a multiple, and you can come along later and change that to a shift.
If you change the implementation so that, say, it's returning 16 bits (remember that sizeof(long) is only guaranteed to be no less than sizeof(short)) then this tests will fail quickly. An integration-level test should probably fail, but not certainly, and it's just as likely as not to fail somewhere far downstream of the computation of pow2(28).
The point is that they really test for diferent situations. If you could build sufficiently details and extensive integration tests, you might be able to get the same level of coverage and degree of fine-grained testing, but it's probably hard to do at best, and the exponential state-space explosion will defeat you. By partitioning the state space using unit tests, the number of tests you need grows much less than exponentially.
You are asking pros and cons of two different things (what are the pros and cons of riding a horse vs riding a motorcycle?)
Of course both are "automated tests" (~riding) but that doesn't mean that they are alternative (you don't ride a horse for hundreds of miles, and you don't ride a motorcycle in closed-to-vehicle muddy places)
Unit Tests test the smallest unit of the code, usually a method. Each unit test is closely tied to the method it is testing, and if it's well written it's tied (almost) only with that.
They are great to guide the design of new code and the refactoring of existing code. They are great to spot problems long before the system is ready for integration tests. Note that I wrote guide and all the Test Driven Development is about this word.
It does not make any sense to have manual Unit Tests.
What about refactoring, which seems to be your main concern? If you are refactoring just the implementation (content) of a method, but not its existence or "external behavior", the Unit Test is still valid and incredibly useful (you cannot imagine how much useful until you try).
If you are refactoring more aggressively, changing methods existence or behavior, then yes, you need to write a new Unit Test for each new method, and possibly throw away the old one. But writing the Unit Test, especially if you write it before the code itself, will help to clarify the design (i.e. what the method should do, and what it shouldn't) without being confused by the implementation details (i.e. how the method should do the thing that it needs to do).
Automated Integration Tests test the biggest unit of the code, usually the entire application.
They are great to test use cases which you don't want to test by hand. But you can also have manual Integration Tests, and they are as effective (only less convenient).
Starting a new project today, it does not make any sense not to have Unit Tests, but I'd say that for an existing project like yours it does not make too much sense to write them for everything you already have and it's working.
In your case, I'd rather use a "middle ground" approach writing:
smaller Integration Tests which only test the sections you are going to refactor. If you are refactoring the whole thing, then you can use your current Integration Tests, but if you are refactoring only -say- the XML generation, it does not make any sense to require the presence of the database, so I'd write a simple and small XML Integration Test.
a bunch of Unit Tests for the new code you are going to write. As I already wrote above, Unit Tests will be ready as soon as you "mess with anything in between", making sure that your "mess" is going somewhere.
In fact your Integration Test will only make sure that your "mess" is not working (because at the beginning it will not work, right?) but it will not give you any clue on
why it is not working
if your debugging of the "mess" is really fixing something
if your debugging of the "mess" is breaking something else
Integration Tests will only give the confirmation at the end if the whole change was successful (and the answer will be "no" for a long time). The Integration Tests will not give you any help during the refactoring itself, which will make it harder and possibly frustrating. You need Unit Tests for that.
I agree with Charlie about Integration-level tests corresponding more to user actions and the correctness of the system as a whole. I do think there is alot more value to Unit Tests than just localizing failures more tightly though. Unit tests provide two main values over integration tests:
1) Writing unit tests is as much an act of design as testing. If you practice Test Driven Development/Behavior Driven Development the act of writing the unit tests helps you design exactly what you code should do. It helps you write higher quality code (since being loosely coupled helps with testing) and it helps you write just enough code to make your tests pass (since your tests are in effect your specification).
2) The second value of unit tests is that if they are properly written they are very very fast. If I make a change to a class in your project can I run all the corresponding tests to see if I broke anything? How do I know which tests to run? And how long will they take? I can guarantee it will be longer than well written unit tests. You should be able to run all of you unit tests in a couple of minutes at the most.
Just a few examples from personal experience:
Unit Tests:
(+) Keeps testing close to the relevant code
(+) Relatively easy to test all code paths
(+) Easy to see if someone inadvertently changes the behavior of a method
(-) Much harder to write for UI components than for non-GUI
Integration Tests:
(+) It's nice to have nuts and bolts in a project, but integration testing makes sure they fit each other
(-) Harder to localize source of errors
(-) Harder to tests all (or even all critical) code paths
Ideally both are necessary.
Examples:
Unit test: Make sure that input index >= 0 and < length of array. What happens when outside bounds? Should method throw exception or return null?
Integration test: What does the user see when a negative inventory value is input?
The second affects both the UI and the back end. Both sides could work perfectly, and you could still get the wrong answer, because the error condition between the two isn't well-defined.
The best part about Unit testing we've found is that it makes devs go from code->test->think to think->test->code. If a dev has to write the test first, [s]he tends to think more about what could go wrong up front.
To answer your last question, since unit tests live so close to the code and force the dev to think more up front, in practice we've found that we don't tend to refactor the code as much, so less code gets moved around - so tossing and writing new tests constantly doesn't appear to be an issue.
The question has a philisophical part for sure, but also points to pragmatic considerations.
Test driven design used as the means to become a better developer has its merits, but it is not required for that. Many a good programmer exists who never wrote a unit test. The best reason for unit tests is the power they give you when refactoring, especially when many people are changing the source at the same time. Spotting bugs on checkin is also a huge time-saver for a project (consider moving to a CI model and build on checkin instead of nightly). So if you write a unit test, either before or after you written the code it tests, you are sure at that moment about the new code you've written. It is what can happen to that code later that the unit test ensures against - and that can be significant. Unit tests can stop bugs before tehy get to QA, thereby speeding up your projects.
Integration tests stress the interfaces between elements in your stack, if done correctly. In my experience, integration is the most unpredictable part of a project. Getting individual pieces to work tends not to be that hard, but putting everything together can be very difficult because of the types of bugs that can emerge at this step. In many cases, projects are late because of what happens in integration. Some of the errors encountered in this step are found in interfaces that have been broken by some change made on one side that was not communicated to the other side. Another source of integration errors are in configurations discovered in dev but forgotten by the time the app goes to QA. Integration tests can help reduce both types dramatically.
The importance of each test type can be debated, but what will be of most importance to you is the application of either type to your particular situation. Is the app in question being developed by a small group of people or many different groups? Do you have one repository for everything, or many repos each for a particular component of the app? If you have the latter, then you will have challenges with inter compatability of different versions of different components.
Each test type is designed to expose the problems of different levels of integration in the development phase to save time. Unit tests drive the integration of the output many developers operating on one repository. Integration tests (poorly named) drive the integration of components in the stack - components often written by separate teams. The class of problems exposed by integration tests are typically more time-consuming to fix.
So pragmatically, it really boils down to where you most need speed in your own org/process.
The thing that distinguishes Unit tests and Integration tests is the number of parts required for the test to run.
Unit tests (theoretically) require very (or no) other parts to run.
Integration tests (theoretically) require lots (or all) other parts to run.
Integration tests test behaviour AND the infrastructure. Unit tests generally only test behaviour.
So, unit tests are good for testing some stuff, integration tests for other stuff.
So, why unit test?
For instance, it is very hard to test boundary conditions when integration testing. Example: a back end function expects a positive integer or 0, the front end does not allow entry of a negative integer, how do you ensure that the back end function behaves correctly when you pass a negative integer to it? Maybe the correct behaviour is to throw an exception. This is very hard to do with an integration test.
So, for this, you need a unit test (of the function).
Also, unit tests help eliminate problems found during integration tests. In your example above, there are a lot of points of failure for a single HTTP call:
the call from the HTTP client
the servlet validation
the call from the servlet to the business layer
the business layer validation
the database read (hibernate)
the data transformation by the business layer
the database write (hibernate)
the data transformation -> XML
the XSLT transformation -> HTML
the transmission of the HTML -> client
For your integration tests to work, you need ALL of these processes to work correctly. For a Unit test of the servlet validation, you need only one. The servlet validation (which can be independent of everything else). A problem in one layer becomes easier to track down.
You need both Unit tests AND integration tests.
Unit tests execute methods in a class to verify proper input/output without testing the class in the larger context of your application. You might use mocks to simulate dependent classes -- you're doing black box testing of the class as a stand alone entity. Unit tests should be runnable from a developer workstation without any external service or software requirements.
Integration tests will include other components of your application and third party software (your Oracle dev database, for example, or Selenium tests for a webapp). These tests might still be very fast and run as part of a continuous build, but because they inject additional dependencies they also risk injecting new bugs that cause problems for your code but are not caused by your code. Preferably, integration tests are also where you inject real/recorded data and assert that the application stack as a whole is behaving as expected given those inputs.
The question comes down to what kind of bugs you're looking to find and how quickly you hope to find them. Unit tests help to reduce the number of "simple" mistakes while integration tests help you ferret out architectural and integration issues, hopefully simulating the effects of Murphy's Law on your application as a whole.
Joel Spolsky has written very interesting article about unit-testing (it was dialog between Joel and some other guy).
The main idea was that unit tests is very good thing but only if you use them in "limited" quantity. Joel doesn't recommend to achive state when 100% of your code is under testcases.
The problem with unit tests is that when you want to change architecture of your application you'll have to change all corresponding unit tests. And it'll take very much time (maybe even more time than the refactoring itself). And after all that work only few tests will fail.
So, write tests only for code that really can make some troubles.
How I use unit tests: I don't like TDD so I first write code then I test it (using console or browser) just to be sure that this code do nessecary work. And only after that I add "tricky" tests - 50% of them fail after first testing.
It works and it doesn't take much time.
We have 4 different types of tests in our project:
Unit tests with mocking where necessary
DB tests that act similar to unit tests but touch db & clean up afterwards
Our logic is exposed through REST, so we have tests that do HTTP
Webapp tests using WatiN that actually use IE instance and go over major functionality
I like unit tests. They run really fast (100-1000x faster than #4 tests). They are type safe, so refactoring is quite easy (with good IDE).
Main problem is how much work is required to do them properly. You have to mock everything: Db access, network access, other components. You have to decorate unmockable classes, getting a zillion mostly useless classes. You have to use DI so that your components are not tightly coupled and therefore not testable (note that using DI is not actually a downside :)
I like tests #2. They do use the database and will report database errors, constraint violations and invalid columns. I think we get valuable testing using this.
#3 and especially #4 are more problematic. They require some subset of production environment on build server. You have to build, deploy and have the app running. You have to have a clean DB every time. But in the end, it pays off. Watin tests require constant work, but you also get constant testing. We run tests on every commit and it is very easy to see when we break something.
So, back to your question. Unit tests are fast (which is very important, build time should be less than, say, 10 minutes) and the are easy to refactor. Much easier than rewriting whole watin thing if your design changes. If you use a nice editor with good find usages command (e.g. IDEA or VS.NET + Resharper), you can always find where your code is being tested.
With REST/HTTP tests, you get a good a good validation that your system actually works. But tests are slow to run, so it is hard to have a complete validation at this level. I assume your methods accept multiple parametres or possibly XML input. To check each node in XML or each parameter, it would take tens or hundreds of calls. You can do that with unit tests, but you cannot do that with REST calls, when each can take a big fraction of a second.
Our unit tests check special boundary conditions far more often than #3 tests. They (#3) check that main functionality is working and that's it. This seems to work pretty well for us.
As many have mentioned, integration tests will tell you whether your system works, and unit tests will tell you where it doesn't. Strictly from a testing perspective, these two kinds of tests complement each other.
I can't see how adding a bunch more
unit tests on individual classes would
help. Wouldn't that make it harder to
refactor as it's much more likely we
will need to throw away and re-write
tests?
No. It will make refactoring easier and better, and make it clearer to see what refactorings are appropriate and relevant. This is why we say that TDD is about design, not about testing. It's quite common for me to write a test for one method and in figuring out how to express what that method's result should be to come up with a very simple implementation in terms of some other method of the class under test. That implementation frequently finds its way into the class under test. Simpler, more solid implementations, cleaner boundaries, smaller methods: TDD - unit tests, specifically - lead you in this direction, and integration tests do not. They're both important, both useful, but they serve different purposes.
Yes, you may find yourself modifying and deleting unit tests on occasion to accommodate refactorings; that's fine, but it's not hard. And having those unit tests - and going through the experience of writing them - gives you better insight into your code, and better design.
Although the setup you described sounds good, unit testing also offers something important. Unit testing offers fine levels of granularity. With loose coupling and dependency injection, you can pretty much test every important case. You can be sure that the units are robust; you can scrutinise individual methods with scores of inputs or interesting things that don't necessarily occur during your integration tests.
E.g. if you want to deterministically see how a class will handle some sort of failure that would require a tricky setup (e.g. network exception when retrieving something from a server) you can easily write your own test double network connection class, inject it and tell it to throw an exception whenever you feel like it. You can then make sure that the class under test gracefully handles the exception and carries on in a valid state.
You might be interested in this question and the related answers too. There you can find my addition to the answers that were already given here.

What is the difference between integration and unit tests?

I know the so-called textbook definition of unit tests and integration tests. What I am curious about is when it is time to write unit tests... I will write them to cover as many sets of classes as possible.
For example, if I have a Word class, I will write some unit tests for the Word class. Then, I begin writing my Sentence class, and when it needs to interact with the Word class, I will often write my unit tests such that they test both Sentence and Word... at least in the places where they interact.
Have these tests essentially become integration tests because they now test the integration of these 2 classes, or is it just a unit test that spans 2 classes?
In general, because of this uncertain line, I will rarely actually write integration tests... or is my using the finished product to see if all the pieces work properly the actual integration tests, even though they are manual and rarely repeated beyond the scope of each individual feature?
Am I misunderstanding integration tests, or is there really just very little difference between integration and unit tests?
The key difference, to me, is that integration tests reveal if a feature is working or is broken, since they stress the code in a scenario close to reality. They invoke one or more software methods or features and test if they act as expected.
On the opposite, a Unit test testing a single method relies on the (often wrong) assumption that the rest of the software is correctly working, because it explicitly mocks every dependency.
Hence, when a unit test for a method implementing some feature is green, it does not mean the feature is working.
Say you have a method somewhere like this:
public SomeResults DoSomething(someInput) {
var someResult = [Do your job with someInput];
Log.TrackTheFactYouDidYourJob();
return someResults;
}
DoSomething is very important to your customer: it's a feature, the only thing that matters. That's why you usually write a Cucumber specification asserting it: you wish to verify and communicate the feature is working or not.
Feature: To be able to do something
In order to do something
As someone
I want the system to do this thing
Scenario: A sample one
Given this situation
When I do something
Then what I get is what I was expecting for
No doubt: if the test passes, you can assert you are delivering a working feature. This is what you can call Business Value.
If you want to write a unit test for DoSomething you should pretend (using some mocks) that the rest of the classes and methods are working (that is: that, all dependencies the method is using are correctly working) and assert your method is working.
In practice, you do something like:
public SomeResults DoSomething(someInput) {
var someResult = [Do your job with someInput];
FakeAlwaysWorkingLog.TrackTheFactYouDidYourJob(); // Using a mock Log
return someResults;
}
You can do this with Dependency Injection, or some Factory Method or any Mock Framework or just extending the class under test.
Suppose there's a bug in Log.DoSomething().
Fortunately, the Gherkin spec will find it and your end-to-end tests will fail.
The feature won't work, because Log is broken, not because [Do your job with someInput] is not doing its job. And, by the way, [Do your job with someInput] is the sole responsibility for that method.
Also, suppose Log is used in 100 other features, in 100 other methods of 100 other classes.
Yep, 100 features will fail. But, fortunately, 100 end-to-end tests are failing as well and revealing the problem. And, yes: they are telling the truth.
It's very useful information: I know I have a broken product. It's also very confusing information: it tells me nothing about where the problem is. It communicates me the symptom, not the root cause.
Yet, DoSomething's unit test is green, because it's using a fake Log, built to never break. And, yes: it's clearly lying. It's communicating a broken feature is working. How can it be useful?
(If DoSomething()'s unit test fails, be sure: [Do your job with someInput] has some bugs.)
Suppose this is a system with a broken class:
A single bug will break several features, and several integration tests will fail.
On the other hand, the same bug will break just one unit test.
Now, compare the two scenarios.
The same bug will break just one unit test.
All your features using the broken Log are red
All your unit tests are green, only the unit test for Log is red
Actually, unit tests for all modules using a broken feature are green because, by using mocks, they removed dependencies. In other words, they run in an ideal, completely fictional world. And this is the only way to isolate bugs and seek them. Unit testing means mocking. If you aren't mocking, you aren't unit testing.
The difference
Integration tests tell what's not working. But they are of no use in guessing where the problem could be.
Unit tests are the sole tests that tell you where exactly the bug is. To draw this information, they must run the method in a mocked environment, where all other dependencies are supposed to correctly work.
That's why I think that your sentence "Or is it just a unit test that spans 2 classes" is somehow displaced. A unit test should never span 2 classes.
This reply is basically a summary of what I wrote here: Unit tests lie, that's why I love them.
When I write unit tests I limit the scope of the code being tested to the class I am currently writing by mocking dependencies. If I am writing a Sentence class, and Sentence has a dependency on Word, I will use a mock Word. By mocking Word I can focus only on its interface and test the various behaviors of my Sentence class as it interacts with Word's interface. This way I am only testing the behavior and implementation of Sentence and not at the same time testing the implementation of Word.
Once I've written the unit tests to ensure Sentence behaves correctly when it interacts with Word based on Word's interface, then I write the integration test to make sure that my assumptions about the interactions were correct. For this I supply the actual objects and write a test that exercises a feature that will end up using both Sentence and Word.
My 10 bits :D
I was always told that Unit Tests is the testing of an individual component - which should be exercised to its fullest. Now, this tends to have many levels, since most components are made of smaller parts. For me, a unit is a functional part of the system. So it has to provide something of value (i.e. not a method for string parsing, but a HtmlSanitizer perhaps).
Integration Tests is the next step up, its taking one or more components and making sure they work together as they should.. You are then above the intricacies of worry about how the components work individually, but when you enter html into your HtmlEditControl , it somehow magically knows wether its valid or not..
Its a real movable line though.. I'd rather focus more on getting the damn code to work full stop ^_^
In unit test you test every part isolated:
in integration test you test many modules of your system:
and this what happens when you only use unit tests (generally both windows are working, unfortunately not together):
Sources:
source1
source2
Unit tests use mocks
The thing you're talking about are integration tests that actually test the whole integration of your system. But when you do unit testing you should actually test each unit separately. Everything else should be mocked. So in your case of Sentence class, if it uses Word class, then your Word class should be mocked. This way, you'll only test your Sentence class functionality.
I think when you start thinking about integration tests, you are speaking more of a cross between physical layers rather than logical layers.
For example, if your tests concern itself with generating content, it's a unit test: if your test concerns itself with just writing to disk, it's still a unit test, but once you test for both I/O AND the content of the file, then you have yourself an integration test. When you test the output of a function within a service, it's a unit-test, but once you make a service call and see if the function result is the same, then that's an integration test.
Technically you cannot unit test just-one-class anyway. What if your class is composed with several other classes? Does that automatically make it an integration test? I don't think so.
using Single responsibility design, its black and white. More than 1 responsibility, its an integration test.
By the duck test (looks, quacks, waddles, its a duck), its just a unit test with more than 1 newed object in it.
When you get into mvc and testing it, controller tests are always integration, because the controller contains both a model unit and a view unit. Testing logic in that model, I would call a unit test.
In my opinion the answer is "Why does it matter?"
Is it because unit tests are something you do and integration tests are something you don't? Or vice versa? Of course not, you should try to do both.
Is it because unit tests need to be Fast, Isolated, Repeatable, Self-Validating and Timely and integration tests should not? Of course not, all tests should be these.
It is because you use mocks in unit tests but you don't use them in integration tests? Of course not. This would imply that if I have a useful integration test I am not allowed to add a mock for some part, fear I would have to rename my test to "unit test" or hand it over to another programmer to work on.
Is it because unit tests test one unit and integration tests test a number of units? Of course not. Of what practical importance is that? The theoretical discussion on the scope of tests breaks down in practice anyway because the term "unit" is entirely context dependent. At the class level, a unit might be a method. At an assembly level, a unit might be a class, and at the service level, a unit might be a component.
And even classes use other classes, so which is the unit?
It is of no importance.
Testing is important, F.I.R.S.T is important, splitting hairs about definitions is a waste of time which only confuses newcomers to testing.
The nature of your tests
A unit test of module X is a test that expects (and checks for) problems only in module X.
An integration test of many modules is a test that expects problems that arise from the cooperation between the modules so that these problems would be difficult to find using unit tests alone.
Think of the nature of your tests in the following terms:
Risk reduction: That's what tests are for. Only a combination of unit tests and integration tests can give you full risk reduction, because on the one hand unit tests can inherently not test the proper interaction between modules and on the other hand integration tests can exercise the functionality of a non-trivial module only to a small degree.
Test writing effort: Integration tests can save effort because you may then not need to write stubs/fakes/mocks. But unit tests can save effort, too, when implementing (and maintaining!) those stubs/fakes/mocks happens to be easier than configuring the test setup without them.
Test execution delay: Integration tests involving heavyweight operations (such as access to external systems like DBs or remote servers) tend to be slow(er). This means unit tests can be executed far more frequently, which reduces debugging effort if anything fails, because you have a better idea what you have changed in the meantime. This becomes particularly important if you use test-driven development (TDD).
Debugging effort: If an integration test fails, but none of the unit tests does, this can be very inconvenient, because there is so much code involved that may contain the problem. This is not a big problem if you have previously changed only a few lines -- but as integration tests run slowly, you perhaps did not run them in such short intervals...
Remember that an integration test may still stub/fake/mock away some of its dependencies.
This provides plenty of middle ground between unit tests and system tests (the most comprehensive integration tests, testing all of the system).
Pragmatic approach to using both
So a pragmatic approach would be: Flexibly rely on integration tests as much as you sensibly can and use unit tests where this would be too risky or inconvenient.
This manner of thinking may be more useful than some dogmatic discrimination of unit tests and integration tests.
Unit Testing is a method of testing that verifies the individual units of source code are working properly.
Integration Testing is the phase of software testing in which individual software modules are combined and tested as a group.
Wikipedia defines a unit as the smallest testable part of an application, which in Java/C# is a method. But in your example of Word and Sentence class I would probably just write the tests for sentence since I would likely find it overkill to use a mock word class in order to test the sentence class. So sentence would be my unit and word is an implementation detail of that unit.
I think I would still call a couple of interacting classes a unit test provided that the unit tests for class1 are testing class1's features, and the unit tests for class2 are testing its features, and also that they are not hitting the database.
I call a test an integration test when it runs through most of my stack and even hits the database.
I really like this question, because TDD discussion sometimes feels a bit too purist to me, and it's good for me to see some concrete examples.
I do the same - I call them all unit tests, but at some point I have a "unit test" that covers so much I often rename it to "..IntegrationTest" - just a name change only, nothing else changes.
I think there is a continuation from "atomic tests" (testing one tiny class, or a method) to unit tests (class level) and integration tests - and then functional test (which are normally covering a lot more stuff from the top down) - there doesn't seem to be a clean cut off.
If your test sets up data, and perhaps loads a database/file etc, then perhaps its more of an integration test (integration tests I find use less mocks and more real classes, but that doesn't mean you can't mock out some of the system).
Integration tests: Database persistence is tested.
Unit tests: Database access is mocked. Code methods are tested.
Unit testing is testing against a unit of work or a block of code if you like. Usually performed by a single developer.
Integration testing refers to the test that is performed, preferably on an integration server, when a developer commits their code to a source control repository. Integration testing might be performed by utilities such as Cruise Control.
So you do your unit testing to validate that the unit of work you have built is working and then the integration test validates that whatever you have added to the repository didn't break something else.
Simple Explanation with Analogies
This answer will focus purely on examples.
Integration Tests
Integration tests check if everything is working together.
Unit Tests
They tell you whether one specific thing is working.
Examples
Consider a car:
Integration test for a car: e.g. does the car drive to Pondicherry and back? If so, the car as whole is working. If it fails, you won't really where where: radiator, transmission, engine, or carburettor?
Unit test for a car: Is the engine is working? This tests just the engine; nothing else. If this test fails, then you can be confident that there is a bug in the engine....This ties in closely with the concept of "fakes". You might need some keys in order to start the engine - except, you don't want to go to the hassle of actually an ignition (with a lock)...instead, you would hotwire the car to start it....in other words you would use a "fake" key.
Similarly, in unit testing, you would use "fakes" in order to make the engine work a particular way. And then you could simply test: "is it running".
I call unit tests those tests that white box test a class. Any dependencies that class requires is replaced with fake ones (mocks).
Integration tests are those tests where multiple classes and their interactions are tested at the same time. Only some dependencies in these cases are faked/mocked.
I wouldn't call Controller's integration tests unless one of their dependencies is a real one (i.e. not faked) (e.g. IFormsAuthentication).
Separating the two types of tests is useful for testing the system at different levels. Also, integration tests tend to be long lived, and unit tests are supposed to be quick. The execution speed distinction means they're executed differently. In our dev processes, unit tests are run at check-in (which is fine cos they're super quick), and integration tests are run once/twice per day. I try and run integration tests as often as possible, but usually hitting the database/writing to files/making rpc's/etc slows.
That raises another important point, unit tests should avoid hitting IO (e.g. disk, network, db). Otherwise they slow down alot. It takes a bit of effort to design these IO dependencies out - i can't admit I've been faithful to the "unit tests must be fast" rule, but if you are, the benefits on a much larger system become apparent very quickly.
A little bit academic this question, isn't it? ;-)
My point of view:
For me an integration test is the test of the whole part, not if two parts out of ten are going together.
Our integration test shows, if the master build (containing 40 projects) will succeed.
For the projects we have tons of unit tests.
The most important thing concerning unit tests for me is, that one unit test must not be dependent on another unit test. So for me both test you describe above are unit tests, if they are independent. For integration tests this need not to be important.
Have these tests essentially become integration tests because they now test the integration of these 2 classes? Or is it just a unit test that spans 2 classes?
I think Yes and Yes. Your unit test that spans 2 classes became an integration test.
You could avoid it by testing Sentence class with mock implementation - MockWord class, which is important when those parts of system are large enough to be implemented by different developers. In that case Word is unit tested alone, Sentence is unit tested with help of MockWord, and then Sentence is integration-tested with Word.
Exaple of real difference can be following
1) Array of 1,000,000 elements is easily unit tested and works fine.
2) BubbleSort is easily unit tested on mock array of 10 elements and also works fine
3) Integration testing shows that something is not so fine.
If these parts are developed by single person, most likely problem will be found while unit testing BubbleSoft just because developer already has real array and he does not need mock implementation.
In addition, it's important to remember that both unit tests and integration tests can be automated and written using, for example, JUnit.
In JUnit integration tests, one can use the org.junit.Assume class to test the availability of environment elements (e.g., database connection) or other conditions.
I get asked this a lot in interviews. Until now I'd ramble on pretentiously about my expertise and pontificate about component and acceptance testing.
For years I'd understood only integration and unit tests. I could, but didn't always bother to, write unit tests as a solo developer honing my skills.
Unit tests
That is a crucial difference. Unit tests are easy to implement and execute, requiring, ideally, no dependencies. That is what mocks are for. It is often easier to not mock everything, particularly where you gain coverage of other functions you wrote. Easier, maybe, but that isn't the idea of unit testing.
I'll reiterate, unit tests are meant to be easy to run and small. Their failure provides immediate insight into where a bug has been introduced.
Here is the hierarchy of tests, from cheap and plentiful at the bottom to slow, expensive, and few, at the top:
Several more layers can be conceptualised, but were omitted for clarity.
Integration tests
With integration tests you would consider bringing in serious external dependencies, such as VMs, virtual networks and appliances. Possibly you could use actual modems, routers, and firewalls where the expense was justified.
These wouldn't be run locally but on a build server. A mixture of local Jenkins and cloud based CI providers fulfil this need.
Other test terminology
That is my understanding that has served me for several years in industry. We could talk about component tests, and get a definition, but if the definition isn't in common circulation then it loses value.
Acceptance tests were what we would call business unit or customer requirements. These would lead the direction of everything and sit at the top of the pyramid (picture a dollar sign).
E2E, or end to end testing was used synonymously with integration tests, but I noticed online it is placed above. I guess it could have more relevance to acceptance tests the integration tests, which would tend to be more detailed with less interest from stakeholders (though immense interest internally in the department).
If you're a TDD purist, you write the tests before you write production code. Of course, the tests won't compile, so you first make the tests compile, then make the tests pass.
You can do this with unit tests, but you can't with integration or acceptance tests. If you tried with an integration test, nothing would ever compile until you've finished!