Get a value of float from a series float in PineScript - compare

I have a 'series float' that was given from ta.atr() function. I need to compare the last element of this 'series float' to another float number. But anything I do, I can not get the element as a float number to make the comparison. What can I do?
Here is part of my code that I'm dealing with the problem:
int min_dev = 1
ATR = ta.atr(length) *100 /close[1]
var float dev_threshold = min_dev * ATR[1]
if (math.abs(dev) >= dev_threshold)
iline = line.new(iLast, pLast, index, price, color = color.blue, xloc = xloc.bar_index)
In the code above, the comparison does not complete, and if doesn't complete.

With the var keyword, this code will be executed only once, at the first bar of your chart.
Maybe you should remove the var keyword no?
var being executed at the first bar and referring to ATR[1] being the previous value of ATR, I'm not sure if there is any previous value to fetch here actually....

Related

How to perform rolling window calculations without SSC packages

Goal: perform rolling window calculations on panel data in Stata with variables PanelVar, TimeVar, and Var1, where the window can change within a loop over different window sizes.
Problem: no access to SSC for the packages that would take care of this (like rangestat)
I know that
by PanelVar: gen Var1_1 = Var1[_n]
produces a copy of Var1 in Var1_1. So I thought it would make sense to try
by PanelVar: gen Var1SumLag = sum(Var1[(_n-3)/_n])
to produce a rolling window calculation for _n-3 to _n for the whole variable. But it fails to produce the results I want, it just produces zeros.
You could use sum(Var1) - sum(Var1[_n-3]), but I also want to be able to make the rolling window left justified (summing future observations) as well as right justified (summing past observations).
Essentially I would like to replicate Python's ".rolling().agg()" functionality.
In Stata _n is the index of the current observation. The expression (_n - 3) / _n yields -2 when _n is 1 and increases slowly with _n but is always less than 1. As a subscript applied to extract values from observations of a variable it always yields missing values given an extra rule that Stata rounds down expressions so supplied. Hence it reduces to -2, -1 or 0: in each case it yields missing values when given as a subscript. Experiment will show you that given any numeric variable say numvar references to numvar[-2] or numvar[-1] or numvar[0] all yield missing values. Otherwise put, you seem to be hoping that the / yields a set of subscripts that return a sequence you can sum over, but that is a long way from what Stata will do in that context: the / is just interpreted as division. (The running sum of missings is always returned as 0, which is an expression of missings being ignored in that calculation: just as 2 + 3 + . + 4 is returned as 9 so also . + . + . + . is returned as 0.)
A fairly general way to do what you want is to use time series operators, and this is strongly preferable to subscripts as (1) doing the right thing with gaps (2) automatically working for panels too. Thus after a tsset or xtset
L0.numvar + L1.numvar + L2.numvar + L3.numvar
yields the sum of the current value and the three previous and
L0.numvar + F1.numvar + F2.numvar + F3.numvar
yields the sum of the current value and the three next. If any of these terms is missing, the sum will be too; a work-around for that is to return say
cond(missing(L3.numvar), 0, L3.numvar)
More general code will require some kind of loop.
Given a desire to loop over lags (negative) and leads (positive) some code might look like this, given a range of subscripts as local macros i <= j
* example i and j
local i = -3
local j = 0
gen double wanted = 0
forval k = `i'/`j' {
if `k' < 0 {
local k1 = -(`k')
replace wanted = wanted + L`k1'.numvar
}
else replace wanted = wanted + F`k'.numvar
}
Alternatively, use Mata.
EDIT There's a simpler method, to use tssmooth ma to get moving averages and then multiply up by the number of terms.
tssmooth ma wanted1=numvar, w(3 1)
tssmooth ma wanted2=numvar, w(0 1 3)
replace wanted1 = 4 * wanted1
replace wanted2 = 4 * wanted2
Note that in contrast to the method above tssmooth ma uses whatever is available at the beginning and end of each panel. So, the first moving average, the average of the first value and the three previous, is returned as just the first value at the beginning of each panel (when the three previous values are unknown).

Understanding & Converting ThinkScripts CompoundValue Function

I'm currently converting a ThinkScript indicator to C#, however, I've run into this CompoundValue function and I'm unsure how to covert it.
The documents reads :
Calculates a compound value according to following rule: if a bar
number is greater than length then the visible data value is returned,
otherwise the historical data value is returned. This function is used
to initialize studies with recursion.
Example Use:
declare lower;
def x = CompoundValue(2, x[1] + x[2], 1);
plot FibonacciNumbers = x;
My interpretation:
Based on description and example. It appears we are passing a calculation in x[1] + x[2] and it performing this calculation on the current bar and the previous bar (based on first param of 2). I'm unsure what the parameter 1 is for.
My Question:
Please explain what this function is actually doing. If possible, please illustrate how this method works using pseudo-code.
For the TLDR; crowd, some simple code that hopefully explains what the CompoundValue() function is trying to do, and which might help in converting it's functionality:
# from: Chapter 12. Past/Future Offset and Prefetch
# https://tlc.thinkorswim.com/center/reference/thinkScript/tutorials/Advanced/Chapter-12---Past-Offset-and-Prefetch
# According to this tutorial, thinkScript uses the highest offset, overriding
# all lower offsets in the script - WOW
declare lower;
# recursive addition using x[1] is overridden by 11 in the plot for
# Average(close, 11) below; SO `x = x[1] + 1` becomes `x = x[11] + 1`
def x = x[1] + 1;
# using CompoundValue, though, we can force the use of the *desired* value
# arguments are:
# - length: the number of bars for this variable's offset (`1` here)
# - "visible data": value to use IF VALUES EXIST for a bar (a calculation here)
# - "historical data": value to use IF NO VALUE EXISTS for a bar (`1` here)
def y = CompoundValue(1, y[1] + 1, 1);
# *plotting* this Average statement will change ALL offsets to 11!
plot Average11 = Average(close, 11);
# `def`ing the offset DOES NOT change other offsets, so no issue here
# (if the `def` setup DID change the offsets, then `x[1]` would
# become `x[14]`, as 14 is higher than 11. However, `x[1]` doesn't change.
def Average14 = Average(close, 14);
plot myline = x;
plot myline2 = y;
# add some labels to tell us what thinkScript calculated
def numBars = HighestAll(BarNumber());
AddLabel(yes, "# Bars on Chart: " + numBars, Color.YELLOW);
AddLabel(yes, "x # bar 1: " + GetValue(x, numBars), Color.ORANGE);
AddLabel(yes, "x # bar " + numBars + ": " + x, Color.ORANGE);
AddLabel(yes, "y # bar 1: " + GetValue(y, numBars), Color.LIGHT_ORANGE);
AddLabel(yes, "y # bar " + numBars + ": " + y, Color.ORANGE);
Now, some, er, lots of details...
First, a quick note on "offset" values:
thinkScript, like other trading-related languages, uses an internal looping system. This is like a for loop, iterating through all the "periods" or "bars" on a chart (eg, 1 bar = 1 day on a daily chart; 1 bar = 1 minute on a 1 minute intraday chart, etc). Every line of code in thinkScript is run for each and every bar in the chart or length of time specified in the script.
As noted by the OP, x[1] represents an offset of one bar before the current bar the loop is processing. x[2] represents two bars before the current bar, and so on. Additionally, it's possible to offset into the future by using negative numbers: x[-1] means one bar ahead of the current bar, for example.
These offsets work similarly to the for loop in C#, except they're backwards: x[0] in C# would represent the current x value, as it would in thinkScript; however, moving forward in the loop, x[1] would be the next value, and x[-1] wouldn't exist because, well, there is no past value before 0. (In general, of course! One can definitely loop with negative numbers in C#. The point is that positive offset indices in thinkScript represent past bars, while negative offset indices in thinkScript represent future bars - not the case in C#.)
Also important here is the concept of "length": in thinkScript, length parameters represent the distance you want to go - like the offset, but a range instead of one specific bar. In my example code above, I used the statement plot Average11 = Average(close, 11); In this case, the 11 parameter represents plotting the close for a period of 11 bars, ie, offsets x[0] through x[10].
Now, to explain the CompoundValue() function's purpose:
The Chapter 12. Past/Future Offset and Prefetch thinkScript tutorial explains that thinkScript actually overrides smaller offset or length values with the highest value in a script. What that means is that if you have two items defined as follows:
def x = x[1] + 1;
plot Average11 = Average(close, 11);
thinkScript will actually override the x[1] offset with the higher length used in the Average statement - therefore causing x[1] to become x[11]!
Yike! That means that the specified offsets, except the highest offset, mean nothing to thinkScript! So, wait a minute - does one have to use all the same offsets for everything, then? No! This is where CompoundValue() comes in...
That same chapter explains that CompoundValue() allows one to specify an offset for a variable that won't be changed, even if a higher offset exists.
The CompoundValue() function, with parameter labels, looks like this:
CompoundValue(length, "visible data", "historical data")
As the OP noted, this isn't really particularly clear. Here's what the parameters represent:
length: the offset number of bars for this variable.
In our example, def x = x[1] + 1, there is a 1 bar offset, so our statement starts as CompoundValue(length=1, ...). If instead, it was a larger offset, say 14 bars, we'd put CompoundValue(length=14, ...)
"visible data": the value or calculation thinkScript should perform if DATA IS AVAILABLE for the current bar.
Again, in our example, we're using a calculation of x[1] + 1, so CompoundValue(length=1, "visible data"=(x[1] + 1), ...). (Parentheses around the equation aren't necessary, but may help with clarity.)
"historical data": the value to use if NO DATA IS AVAILABLE for the current bar.
In our example, if no data is available, we'll use a value of 1.
Now, in thinkScript, parameter labels aren't required if the arguments are in order and/or defaults are supplied. So, we could write this CompoundValue statement like this without the labels:
def y = CompoundValue(1, y[1] + 1, 1);
or like this with the labels:
def y = CompoundValue(length=1, "visible data"=(y[1] + 1), "historical data"=1);
(Note that parameter names containing spaces have to be surrounded by double quotes. Single-word parameter names don't need the quotes. Also, I've placed parens around the equation just for the sake of clarity; this is not required.)
In summary: CompoundValue(...) is needed to ensure a variable uses the actual desired offset/number of bars in a system (thinkScript) that otherwise overrides the specified offsets with a higher number if present.
If all the offsets in a script are the same, or if one is using a different programming system, then CompoundValue() can simply be broken down into its appropriate calculations or values, eg def x = x[1] + 1 or, alternatively, an if/else statement that fills in the values desired at whatever bars or conditions are needed.
Please let me provide two equivalent working versions of the code in thinkscript itself. We use this approach to prove equivalence by subtracting the equivalent outputs from each other - the result should be 0.
# The original Fibonacci code with a parameter "length" added.
# That parameter is the first parameter of the CompoundValue function.
declare lower;
def length = 2;
def x = CompoundValue(length, x[1] + x[2], 1);
# plot FibonacciNumbers = x;
# Equivalent code using the `if` statement:
def y;
if(BarNumber() > length){
# Visible data. This is within the guarded branch of the if statement.
# Historical data y[1] (1 bar back) and y[2] (2 bars back) is available
y = y[1] + y[2];
}else{
# Not enough historical data so we use the special case satisfying the
# original rule.
y = 1;
}
plot FibonacciNumbersDiff = y - x;
Thinkscript "recursion" is a somewhat inflated term. The function name CompoundValue is not very helpful so it may create confusion.
The version using the if statement is more useful in general because when walking through the time series of bars, we often need a program structure with multiple nested if statements - this cannot be done with the CompoundValue function. Please see my other articles which make use of this in the context of scanning.
In Java, using the same structure, it looks like this:
int size = 100;
int length = 2;
int[] values = new int[size];
for(int index = 1; index < size; index++){
if(index > length){
values[index] = values[index - 1] + values[index - 2];
}else{
values[index] = 1;
}
}
The fundamental difference is the for loop which is not present in the thinkscript code. thinkscript provides the loop in a kind of inversion of control where it executes user code multiple times, once for each bar.

How to use fold statement index in function call

The fold manual gives an example:
input price = close;
input length = 9;
plot SMA = (fold n = 0 to length with s do s + getValue(price, n, length - 1)) / lenth;
This effectively calls a function iteratively like in a for loop body.
When I use this statement to call my own function as follows, then it breaks because the loop index variable is not recognized as a variable that can be passed to my function:
script getItem{
input index = 0;
plot output = index * index;
}
script test{
def total = fold index = 0 to 10 with accumulator = 0 do
accumulator + getItem(index);########## Error: No such variable: index
}
It is a known bug / limitation. Has been acknowledged without a time line for a fix. No workaround available.
Have you tried adding a small remainder to your defined variable within the fold and then pass that variable? You can strip the integer value and then use the remainder as your counter value. I've been playing around with somethin similar but it isn't working (yet). Here's an example:
script TailOverlap{
input i = 0;
def ii = (Round(i, 1) - i) * 1000;
... more stuff
plot result = result;
};
def _S = (
fold i = displace to period
with c = 0
do if
TailOverlap(i = _S) #send cur val of _S to script
then _S[1] + 1.0001 #increment variable and counter
else _S[1] + 0.0001 #increment the counter only
);
I'm going to continue playing around with this. If I get it to work I'll post the final solution. If you're able to get work this (or have discovered another solution) please do post it here so I know.
Thanks!

Setting a label's text value by multiplying a two different texbox values

I'm pretty new to Qt and I'm struggling to set a label's text value set to the result of multiplying two other textbox values.
The user will enter a number into a textbox and then will press OK. I want the my label to show the result of the entered number * another label.
Simple Pseudo Code
labelTotal.text = Textboxdistance.text * labelForcePerStep.text
Notes:
QTextEdit::text() returns content of the text box as a string.
QString::toInt() converts a string to its corresponding integer.
QString::number() converts an integer to its representing string.
Code:
int n1 = Textboxdistance.text().toInt();
int n2 = labelForcePerStep.text().toInt();
labelTotal.setText(QString::number(n1 * n2));

Count value in template expression

I want to count a value inside a template expression, in Xtend, without printing it out.
This is my code:
def generateTower(Tower in) {
var counter = 0.0;
'''
One Two Three Four
«FOR line : in.myTable»
«counter» «line.val1» «line.val2» «line.val3»
«counter = counter + 1»
«ENDFOR»
'''
}
So this will generate a table with four columns, whereas the first column is incremented starting at 0.0. The problem is, that «counter = counter + 1» is printed as well. But I want the expression above to just count up, without printing it out.
What could be the best solution to solve this problem?
You could use this simple and readable solution:
«FOR line : in.myTable»
«counter++» «line.val1» «line.val2» «line.val3»
«ENDFOR»
If you insist on the separate increment expression, use a block with null value. This works because the null value is converted to empty string in template expressions (of course you could use "" as well):
«FOR line : in.myTable»
«counter» «line.val1» «line.val2» «line.val3»
«{counter = counter + 1; null}»
«ENDFOR»
Although the first solution is the better. If you require complex logic in a template expression I recommend implementing it by methods not by inline code...
And finally, here is a more OO solution for the problem:
class TowerGenerator {
static val TAB = "\t"
def generateTower(Tower in) {
var counter = 0
'''
One«TAB»Two«TAB»Three«TAB»Four
«FOR line : in.myTable»
«generateLine(line, counter++)»
«ENDFOR»
'''
}
def private generateLine(Line line, int lineNumber) '''
«lineNumber»«TAB»«line.val1»«TAB»«line.val2»«TAB»«line.val3»
'''
}
Xtend is a full-fledged programming language. You can write Java-like expressions and templates. The problem there is that you're inside a triple quote (template), and everything you write there gets outputted. You can count inside the loop, but take into account that you're counting the elements in the in.myTable collection, and this can be obtained using in.myTable.length. So count could be calculated beforehand as in.myTable.length.
«{counter = counter + 1; null}» definitely worked. But as a recommendation, since it is java, writing it as «{counter++; null}» should do the trick as well. It helps because, you may need to modify your code and you can also put it in front as in: ++counter - by putting the operator first, the compiler takes a number, adds one to it before reading the value.