I have a chart on my web site that shows user per hour per day, but for ease of reading I'd like to put a line at each new day on the graph.
How do I go about doing this? I just really need a starting point but so far all of my Google searches are to broad.
Thanks in advance,
T.
Related
I am trying to specify a time that starts a shift premium for a time card. I was so happy I finally figured out how to get it, but then I changed a time to a first shift time and thats when I lost all hope. I have spent hours messing with this and my current formula's looks like
x1.05
=IF(COUNT(A20:B20)=2,MOD($B$18-A20,1)*24,"")
x1.1
=IF(COUNT(A20:B20)=2,MOD(B20-$B$18,1)*24,"")
My end goal is to have it so first shift (7am - 3pm) fall under base pay, 2nd shift (4pm-12am) fall under x1.05 and anything past 12am falls under x1.1
Just getting this far has been a mind blower for me and any help would be greatly appreciated.
I have moved this to its own sheet to share with everyone. I am still playing with things myself and trying different things, but on the sheet I have included the variables along with the wording of the contract that effects the pay scale. NOTE the times I originally provided were just examples from the top of my head.
My Sheet
It doesn't look like your current sheet accounts for the multiple criteria you're wanting to evaluate. First shift (x1) begins at 7; second shift (x1.05) begins at 15:00, and third shift (x1.10) begins at 24:00.
I added each of those directly above the columns they affect and used this formula for the Base column:
=IF(COUNT($A20:$B20)=2,IF($A20<F$18,(MOD(MIN(F$18,$B20)-$A20,1))*24,0),"")
...this for the x1.05 column:
=IF(COUNT($A20:$B20)=2,IF($A20<G$18,(MOD(MIN(G$18,$B20)-$A20,1)*24)-E20,0),"")
...and this for the x1.10 column:
=IF(COUNT($A20:$B20)=2,(MOD(MIN(E$18+1,$B20)-$A20,1)*24)-SUM(E20:F20),"")
So far, it's working as expected. One thing I didn't add into it is to account for someone who starts their shift before 7 a.m. If you want this to be included in the x1.10 column, you could add a calculation for that to the formula there.
Here's what it looks like:
I'm working in Excel, but these formulas should all work in Google Sheets as well.
I have asked a few questions related to this personal project of mine already on this platform, and this should be the last one since I am so close to finishing. Below is the link to a mock example spreadsheet I've created, which mimics what my actual project does but it contains less sensitive information and is also smaller in size.
Mock Spreadsheet
Basic rundown of the spreadsheet:
Pulls data from a master schedule which is controlled/edited by another party into the Master Schedule tab.
In the columns adjacent to the imported data, an array formula expands the master schedule by classroom in case some of the time slots designate multiple rooms. Additional formulas adjust the date, start time, and end time to be capped within the current day's 24-hour period. The start time of each class is also made to be an hour earlier.
In the Room Schedule tab, an hourly calendar is created based on the room number in the first column, and only corresponds to the current day.
I have tested the spreadsheet extensively with multiple scenarios, and I'm happy with how everything works except for the calculation time. I figured the two volatile functions I use would take some processing time just by themselves, and I certainly didn't expect this to be lightning-fast especially without using a script, but the project that I am actually implementing this method for is much larger and takes a very long time to update. The purpose of this spreadsheet is to allow users to find an open room and "reserve" it by clicking the checkbox next to it (which will consequently color the entire row red) allowing everyone else to know that it is now taken.
I'd like to know if there is any way to optimize / speed up my spreadsheet, or to not update it every time a checkbox is clicked and instead update it "manually", similar to what OP is asking here. I am not familiar with Apps Script nor am I well-versed in writing code overall, but I am willing to learn - I just need a push in the right direction since I am going into this blind. I know the number of formulas in the Room Schedule tab is probably working against me yet I am so close to what I wanted the final product to be, so any help or insight is greatly appreciated!
Feel free to ask any questions if I didn't explain this well enough.
to speed up things you should avoid usage of the same formulae per each row and make use of arrayformulas. for example:
=IF(AND(TEXT(K3,"m/d")<>$A$1,(M3-L3)<0),K3+1,K3+0)
=ARRAYFORMULA(IF(K3:K<>"",
IF((TEXT(K3:K, "m/d")<>$A$1)*((M3:M-L3:L)<0), K3:K+1, K3:K+0), ))
=IF(AND(TEXT(K3,"m/d")=$A$1,(M3-L3)<0),TIMEVALUE("11:59:59 PM"),M3+0)
=ARRAYFORMULA(IF(K3:K<>"",
IF((TEXT(K3,"m/d")=$A$1)*((M3-L3)<0), TIMEVALUE("11:59:59 PM"), M3:M+0), ))
While training my predictor I came across this error and I got stuck how to fix it.
I have two data-series, a "Target time-series data" with 9234 rows and a single "item_id" and a second one that is "Related time-series data" with the same number of rows as I only have a single id.
I'm setting de data with a window of 180 days, what is exactly the difference between the second and the first number that has appeared on the error, 9414 - 9234 = 180.
We were unable to train your predictor.
Please ensure there are no missing values for any items in the related time series, All items need data until 2020-03-15 00:00:00.0. For example, following items have missing data: item: brl only has 9234/9414 required datapoints starting 1994-06-07 00:00:00.0, please refer to documentation for additional details.
Once my data don't have missing data and it's on a daily basis why is it returning this error?
My data starts on 1994-06-07 and ends on 2019-09-17. Why should I have 9414 data points rather than 9234?
Should I take out 180 days in my "Target time-series data"?
The future values of the related time-series data must be known.
Example of a good related-time series: You know past and future days in which marketing has or will send email newsletters promoting the product you're forecasting. You can use this data as a related-time series.
Example of a bad related-time series: You notice that Google searches for your brand correlated with the sale of your product. As a result you want to use it as a related-time series. Since you don't know how many searches will occur in the future, so you can't use this as a related time series.
In you case, You have TARGET_TIME_SERIES data for 9414 days and you want to predict demand for the next 180 days. That means your RELATED_TIME_SERIES data should be 9594 days.
Edit: I have not tested this with amazon's forecasting product. I'm basing my answer on working with Facebook Prophet (which is one of the models amazon forcast uses). Please let me know if my solution worked.
I'm currently working an a very simple project management template.
The Idea is that after entering a start and end-date columns will show up as a very simplistic gantt chart (conditional formating).
Everything works fine, until "year" comes into consideration. Since it is a several years lasting project and we work with calenderweeks it is essential that the work package is only visualized in its specific year.
So I came up with the following (rough'n'dirty) formular (example from cell K3):
=and(if(K$2>=$F3;1;0);if(K$2<=$H3;1;0);if(or(right($E3;4)=K$1;1);(right(G3;4)=K1;1;0)))
This is the document: https://docs.google.com/spreadsheets/d/15F1uBnoHMuJqc_w0X04U5-ZCQ_6mgO_HJqvN5U28cog/edit?usp=sharing
Problem: GoogleSpreadsheets only alows three arguments with IF. But I do not know how to structure it otherwise...
Thankful for any suggestion!
Cheers,
Matt
This might be what you are looking for, ties the start week/ end week and year together for comparison.
=IF(AND(
(K$1&TEXT(K$2;"00")) >=(RIGHT($E$3;4)&TEXT($F$3;"00"));
(K$1&TEXT(K$2;"00")) <=(RIGHT($G$3;4)&TEXT($H$3;"00")))
;1;0)
After hours of searching the web (including SO), I am requesting advice from the community. RRD seems to be the right tool for this, but I could not get a straight answer until now.
My question is : Is it possible to get RRD output a graph for the day, that averages data from the past year ?
In other words, I want the "view span" to be one day long, but the "data span" to extend over the last 12 months, so that for 6pm, the value will be computed as the average value of ALL previous traffic measured at 6pm last 12 months.
Any hints, or instructions welcomed!
There is no direct way to create such a graph, at least in theory it would be possible using multiple DEF lines together with the SHIFT operation to create such a chart ... you would have to use a program to create the necessary command line though